SUMMARY OF METHODOLOGICAL WORK Samir Amous, APEX, Tunisia Regional Centre for North Africa and Middle-East

SUMMARY OF METHODOLOGICAL WORK Samir Amous, APEX, Tunisia Regional Centre for North Africa and Middle-East Tel : +216 71 848 094 --- Fax : +216 71 843 453 amous.apex@gnet.tn. AIM OF THE WORK.

abba
Download Presentation

SUMMARY OF METHODOLOGICAL WORK Samir Amous, APEX, Tunisia Regional Centre for North Africa and Middle-East

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUMMARY OF METHODOLOGICAL WORK Samir Amous, APEX, TunisiaRegional Centre for North Africa and Middle-East Tel : +216 71 848 094 --- Fax : +216 71 843 453amous.apex@gnet.tn CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  2. AIM OF THE WORK • Develop technical background materialS that can support different steps in the CDM project cycle to be used by national teams and international audience. CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  3. AIM OF THE WORK (CONTINUED) • Assess different methodological approaches in relation to national CDM project cases and develop good practice guidance for project assessment: • Transparency and simplicity. • Efficiency in facilitating fast project development with low transaction costs. • Efficiency in reducing GHG emissions and assissting sustainable development goals. • Replicability – implying that project developers and host countries can use the approach in a similar way. • Enhancement of national capacity to participate in CDM markets and other CC activities. • Review internationally available guidance material. • Develop technical background material that can support different steps in the CDM project cycle to be used by national teams and international audience. • Assess different methodological approaches in relation to national CDM project cases and develop good practice guidance for project assessment. The approaches applied and developed in this project should facilitate: • Transparency and simplicity. • Efficiency in facilitating fast project development with low transaction costs. • Efficiency in reducing GHG emissions and assissting sustainable development goals. • Replicability – implying that project developers and host countries can use the approach in a similar way. • Enhancement of national capacity to participate in CDM markets and other CC activities. • . CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  4. Types of background/methodological work • Research ( R ) • Guidance material (G) • Manual ( M) • Training material (T) CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  5. Background/methodological products - Responsibilities • UCCEE-Denmark work on the issues and coordinate the work • Regional Centreswork direclty on the issues considered • National teamswill feed the Background/ methodological products with countries’ perception, feed-back and experiences CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  6. Background/methodological products - Approach • Will take stock of international experiences on different aspects to be addressedState of the Art • Will feed the National projects (studies, training, etc.) • Will be used and adapted according to national circumstances (NTSE responsibilit, with assistance from Regional Centres) CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  7. 1. Legal and institutionalframework for CDM CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  8. R (background paper), M, G, • Legal, regulatory, financial, technical and institutional framework for project implementation (including DNA organisational structure and operationalization) • Capacity for negotiating with project financers and others • Private sector participation/public co-operator • First draftEnd of March 2003. • The final paper should include national inputs (e.g. reflecting invetsment structures) CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  9. 2.BASELINEdetermination CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  10. R (background paper), M and T: • Generic Baseline Approaches • Litterature review • Synthesis • Case examples and illustrative cases (e.g. electrical sector, small scale projects) • Best practices • First draftEnd of March 2003. CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  11. 3.Project CycleOperations CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  12. R (background paper), G and T: • Additionality • Project implementation and operations (identification…baseline determination, Validation, etc…monitoring…certification) • Synthesis • Case examples and illustrative cases (e.g. electrical sector, small scale projects) • Best practices • First draftEnd of March 2003. CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  13. 4.SustainableDevelopmentIssues CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  14. G and M: • Use of reference related to development and Climate Changeinternational litterature • Guidelines to integrate SD aspects into CDM project assessment • Indicators on SD • Case examples and illustrative cases • National teams should be involved • First draftEnd of March 2003. CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  15. 5.Risk and benefitSharing(Short & Long-term) CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  16. Will certainly be raised as soon as the PK is ratified • To be considered later during the project CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  17. 6.Possible other emerging issues CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002

  18. To be decided later CD for CDM - Phase 1 - First National Workshop, Egypt 17-18 December 2002