An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Steve RueckertDirector of Standards Standards Update – Operating Committee March 25-26, 2014

  2. WECC Standards Activities • BAL-004-WECC-2 – ATEC • Effective April 1, 2014 • BAL-002-WECC-2 – Contingency Reserves • Effective October 1, 2014 • Potential Workshop

  3. WECC Standards Activities • IRO-006-WECC-2 – Qualified Transfer Path Unscheduled Flow • Filed with FERC December 20, 2013 • TOP-007-WECC-1 – Interpretation • Filed with FERC March 12, 2014 • RD Docket Number

  4. WECC Standards Activities • Current Drafting Activities • WECC-0101 – Generator Validation • WECC-0105 – P81 Revisions to VAR Standards • WECC-0107 – PSS Design and Performance • WECC-0100 – TPL-001-WECC-RBP-3, System Performance • WECC-0106 – INT-018-WECC-RBP-0, E-Tag Energy Product Codes

  5. WECC Standards Activities • WECC Standards Committee Sector 1 (Transmission) Representative – April 1-15 • Dana Cabbell – Southern California Edison • Kristie Cocco– Arizona Public Service • John Hagen – Pacific Gas and Electric • Three Additional Sectors Unopposed • Sector 2 (Generation) – Angela Small • Sector 5 (System Coordination) – Joe Tarantino • Sector 8 (Other Non-registered) Crystal Musselman

  6. NERC Standards Activities • Physical Security Standard • 90-day Deadline • File with FERC by June 5 • Shortened Comment and Ballot Windows • Expedited Schedule Posted on the NERC Website • Significant WECC Representation on the Drafting Team

  7. NERC Standards ActivitiesRecent Approvals • Generator Verification • MOD-025 – Gross Net and Reactive Power • MOD-026 – Excitation System or Volt/Var Control • MOD-027 – Turbine/Governor and Load Control • PRC-019 – Coordination of Unit or Plant Capabilities, Voltage Regulation and Protection • PRC-024 – Frequency and Voltage Protective Relay Settings

  8. NERC Standards ActivitiesRecent Approvals • Revised Definition of Bulk Electric System • NOPR Proposing to Approve • PRC-025-1 – Generator Relay Loadability • PRC-023-3 – Transmission Relay Loadability

  9. Additional Information • All current WECC project information is available on the WECC Under Development website page. http://www.wecc.biz/Standards/Development/Pages/default.aspx • NERC Standards Under Development http://www.nerc.com/pa/Stand/Pages/Standards-Under-Development.aspx • If you wish to receive announcements related to WECC Standards Development, send a note to distribution@wecc.biz asking to be added to the WECCSTDS distribution list

  10. Questions?