50 likes | 193 Views
IRO-006-WECC-2 Steve Rueckert Director of Standards. Pre-Ballot Webinar Meeting November 20, 2012. IRO-006-WECC-2. Recognized need to modify to reflect revisions to the WECC Unscheduled Flow Mitigation Plan Agreement that the changes were errata in nature No revisions to who had to do what
E N D
IRO-006-WECC-2Steve RueckertDirector of Standards Pre-Ballot Webinar Meeting November 20, 2012
IRO-006-WECC-2 • Recognized need to modify to reflect revisions to the WECC Unscheduled Flow Mitigation Plan • Agreement that the changes were errata in nature • No revisions to who had to do what • Updates to references and removal of old table
IRO-006-WECC-2 • WECC Board approved errata changes at the June 2012 WECC Board meeting • NERC Standards staff rejected the changes as errata at the July NERC Standards Committee meeting • NERC informed WECC we would have to take the changes through the WECC Reliability Standards Development Procedures
IRO-006-WECC-2 • Posted for two comment periods • First required by WECC Procedures • Second a result of boiler plate type changes recommended by NERC during their review of the document • No significant comments or disagreements with the requirements of the standard • One comment on the effective date • Seeking approval of the revisions that the Board approved as errata