1 / 21

2010 Draft Results Stan Holland

2010 Draft Results Stan Holland. Data Work Group Meeting June 5, 2012 . Changes to Data/Modeling Assumptions. Reinstated missing units Dave Johnston 1-4 Jim Bridger 1-4 Wyodak 1 Adjustments to Hydro Problems with renaming of BCTC to BCH Reinstated missing bus ING 500_50194

abeni
Download Presentation

2010 Draft Results Stan Holland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010 Draft ResultsStan Holland Data Work Group Meeting June 5, 2012

  2. Changes to Data/Modeling Assumptions • Reinstated missing units • Dave Johnston 1-4 • Jim Bridger 1-4 • Wyodak 1 • Adjustments to Hydro • Problems with renaming of BCTC to BCH • Reinstated missing bus • ING 500_50194 • Fixed BCH fuel references (gas and coal) • Increased heat rates for Alberta cogens • Revised a few hurdle rates

  3. Path 3 – NW to BC – 6/1/12 Run

  4. Path 3 – NW to BC – 6/1/12 Run 2010 Actual 2010 Simulation

  5. Path 66 – COI – 6/1/12 Run

  6. Path 66 – COI – 6/1/12 Run

  7. Path 65 – PDCI – 6/1/12 Run

  8. Path 65 – PDCI – 6/1/12 Run

  9. Path 46 – West of River – 6/1/12 Run

  10. Path 46 – West of River – 6/1/12 Run

  11. Path 26 – No. to So. Calif. – 6/1/12 Run

  12. Path 26 – No. to So. Calif. – 6/1/12 Run

  13. Path 1 – Alberta to B.C. – 6/1/12 Run

  14. Path 1 – Alberta to B.C. – 6/1/12 Run

  15. Path 8 – Montana to NW – 6/1/12 Run

  16. Path 8 – Montana to NW – 6/1/12 Run

  17. Path 20 – Path C – 6/1/12 Run

  18. Path 20 – Path C – 6/1/12 Run

  19. Final Questions & Comments

More Related