210 likes | 310 Views
2010 Draft Results Stan Holland. Data Work Group Meeting June 5, 2012 . Changes to Data/Modeling Assumptions. Reinstated missing units Dave Johnston 1-4 Jim Bridger 1-4 Wyodak 1 Adjustments to Hydro Problems with renaming of BCTC to BCH Reinstated missing bus ING 500_50194
E N D
2010 Draft ResultsStan Holland Data Work Group Meeting June 5, 2012
Changes to Data/Modeling Assumptions • Reinstated missing units • Dave Johnston 1-4 • Jim Bridger 1-4 • Wyodak 1 • Adjustments to Hydro • Problems with renaming of BCTC to BCH • Reinstated missing bus • ING 500_50194 • Fixed BCH fuel references (gas and coal) • Increased heat rates for Alberta cogens • Revised a few hurdle rates
Path 3 – NW to BC – 6/1/12 Run 2010 Actual 2010 Simulation