1 / 7

PUBLIC RESOURCES CODE

PUBLIC RESOURCES CODE. DIVISION 8 - SURVEYING AND MAPPING REVISIONS EFFECTIVE JANUARY 1, 2006. PUBLIC RESOURCES CODE. CHAPTER 1, CALIFORNIA COORDINATE SYSTEM (Revised) CHAPTER 2, TOPOGRAPHICAL MAPPING (No Change) CHAPTER 3, GEODETIC DATUMS AND THE CALIFORNIA SPATIAL REFERENCE NETWORK (New)

abeni
Download Presentation

PUBLIC RESOURCES CODE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUBLIC RESOURCES CODE DIVISION 8 - SURVEYING AND MAPPING REVISIONS EFFECTIVE JANUARY 1, 2006

  2. PUBLIC RESOURCES CODE • CHAPTER 1, CALIFORNIA COORDINATE SYSTEM (Revised) • CHAPTER 2, TOPOGRAPHICAL MAPPING (No Change) • CHAPTER 3, GEODETIC DATUMS AND THE CALIFORNIA SPATIAL REFERENCE NETWORK (New) • CHAPTER 4, CALIFORNIA GEODETIC COORDINATES (New) • CHAPTER 5, CALIFORNIA ORTHOMETRIC HEIGHTS (New)

  3. PUBLIC RESOURCES CODE • CHAPTER 1 California Coordinate System (Revised) • Deletes incorrect references to “geodetic positions” • Deletes portions that are covered in the new Chapter 3, “Geodetic Datums and the California Spatial Reference Network” • Reduces the number of required “reference” stations from two to one • If an accuracy is claimed for the CCS values, requires specific information to be shown and documented

  4. PUBLIC RESOURCES CODE • CHAPTER 3 Geodetic Datums and the California Spatial Reference Network (New) • Establishes NAD83 as the official datum for horizontal positions and ellipsoid heights • Establishes NAVD88 as the official datum for orthometric heights (elevations) • Establishes the California Spatial Reference Network (CSRN) as the official “control” network • Defines the requirements for stations included in the CSRN; similar to the provisions defining the California Spatial Reference System - Horizontal in the previous CCS statutes

  5. PUBLIC RESOURCES CODE • CHAPTER 4 California Geodetic Coordinates (New) • Establishes definitions and procedural requirements for certain geodetic surveys, similar to Chapter 1 (CCS) • Provides that positions conforming to the statutes may be identified as “California Geodetic Coordinates of 1983” (CGC83) • Specifies the documentation required for CGC83 surveys

  6. PUBLIC RESOURCES CODE • CHAPTER 5 California Orthometric Heights (New) • Establishes definitions and procedural requirements for certain orthometric height surveys, similar to Chapter 1 (CCS) and Chapter 4 (CGC) • Provides that orthometric height values conforming to the statutes may be identified as “California Orthometric Heights of 1988” (COH88) • Specifies that the latest NGS “geoid model” shall be used when determining COH88 values from ellipsoid heights; permits the use of “local orthometric height correction” models • Specifies the documentation required for COH88 surveys

  7. PUBLIC RESOURCES CODE • Use of the new statutes is optional • Comments: Dick Davis (916) 227-7328 • Adrian_Davis@dot.ca.gov

More Related