Network Distribution Center (NDC) Update

Network Distribution Center (NDC) Update. Jordan M Small Vice President, Network Operations. Agenda. Update on Activation Results Impacts Next Steps. Update on Activation. Decision to Accelerate Implementation. Peak Season Approaching. Accelerated Implementation. Phase 1. Phase 2.

adamdaniel
Download Presentation

Network Distribution Center (NDC) Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network Distribution Center (NDC) Update Jordan M Small Vice President, Network Operations

  2. Agenda • Update on Activation • Results • Impacts • Next Steps

  3. Update on Activation Decision to Accelerate Implementation Peak Season Approaching Accelerated Implementation Phase 1 Phase 2 Phase 3 Phase 4 • 5/18 – 7/17 • 3 NDCs • Complete • 8/10 – 9/11 • 6 NDCs • Complete • 9/14 – 10/9 • 5 NDCs • Complete 10/19 – 11/20 7 NDCs 4 X • Mar 1-12 • 3 NDCs • Complete activation

  4. Results – Package Service Scores Start of NDC Activation 15-20% service increase SPLY Jan 30

  5. Network Impacts • Operational Impacts • NDCs operate like P&DCs • Live loads and unloads at all NDCs • Operating plan changes required to coincide with STC containerization & dispatch plan • NDC sort to ADCs, AADCs and NDCs • Transportation Impacts • Streamline network • Increase utilization of assets • Improve transit time

  6. Mail Preparation Impacts • Separation requirements • Standard: • Local NDC service area • Network NDC split(s) • Two splits required for directional dispatch sites • Periodicals: • L201 (First Class Surface destinations) • Rest of Network • Integration of Origin mail preparation • USPS Retail, BMEU and Plant separation enabled through the use of Retail Distribution Codes

  7. Customer Impacts • Improved Service • No expansion to the number of entry points • No required changes to FAST or Critical Entry Times (CETs) • Minimal changes to origin induction preparation

  8. Next Steps • Complete activation: March 1-12 • Consolidate Mixed States distribution into 18 sites beginning April 5 • Combine STC and NDC operations in the NDC facility • DMM Modification