June 2012 Generation Resource Energy and Regulation Deployment Summary QMWG
Daily Summary Graph • For this analysis, we captured unique HDL/LDL overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes • There were 14 total unique overrides in June • As compared to 8 in May and 1 in April
Reasons for Manual HDL/LDL Overrides • Outages required overrides as a result of local voltage issues • The following constraint had SCED executions counted towards irresolvability: • XBA3T89 : 2585_1 • This constraint has not met the criteria for resetting the shadow price cap