1 / 8

June 2012 Generation Resource Energy and Regulation Deployment Summary

Explore the June 2012 energy deployment summary and manual overrides analysis, highlighting unique HDL/LDL overrides and reasons for manual overrides. Understand the constraints affecting SCED executions.

andreapaul
Download Presentation

June 2012 Generation Resource Energy and Regulation Deployment Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. June 2012 Generation Resource Energy and Regulation Deployment Summary QMWG

  2. Non-IRR GREDP – Energy Deployments

  3. IRR GREDP Summary

  4. June IRR Failures

  5. Manual HDL/LDL Override Summary QMWG

  6. Daily Summary Graph • For this analysis, we captured unique HDL/LDL overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes • There were 14 total unique overrides in June • As compared to 8 in May and 1 in April

  7. Daily Summary Table

  8. Reasons for Manual HDL/LDL Overrides • Outages required overrides as a result of local voltage issues • The following constraint had SCED executions counted towards irresolvability: • XBA3T89 : 2585_1 • This constraint has not met the criteria for resetting the shadow price cap

More Related