Prince William Sound Regional Citizen’s Advisory Committee Board Meeting May 4, 2007

Prince William Sound Regional Citizen’s Advisory Committee Board Meeting May 4, 2007. Health, Safety & Environment. 2007 VMT Major Focus Areas. Safety Process Safety Management LPS Trend analysis Integration of “Lessons Learned” 90s Tank – Vapor Recovery System Tank 55 and Tank 56

aglaia
Download Presentation

Prince William Sound Regional Citizen’s Advisory Committee Board Meeting May 4, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prince William SoundRegional Citizen’s Advisory CommitteeBoard MeetingMay 4, 2007

  2. Health, Safety & Environment

  3. 2007 VMT Major Focus Areas • Safety • Process Safety Management • LPS • Trend analysis • Integration of “Lessons Learned” • 90s Tank – Vapor Recovery System • Tank 55 and Tank 56 • East Tank Farm – Internal Tank Inspections • Allison Creek turbidity • 2007 Corrosion Action Plan

  4. 2007 VMT Projects • BWT Vapor Recovery • BWT Pilot Studies • Tank Program • Corrosion • Main Gate

  5. Ballast Water Treatment Renovation Program • Completed the installation of the Biological Treatment Tank (BTT) recycle pump  • Currently undergoing the Functional Check Out phase • Completed the final hookup to the Dissolved Air Floatation (DAF) BETX analyzer  • Currently undergoing the Functional Check Out phase. • Initiated testing on the Phase Extraction Technology (PET) air stripper pilot unit -  Testing is ongoing • Initiated testing on the PhotoCat pilot unit  • The unit is offline awaiting resolution of reliability issues before further testing resumes • Advanced the work on the oil/water analyzer and new DAF and BTT sump re-route work -  Project not yet completed • Continued working to install new Dissolved Oxygen and Salinity probes throughout the BWT processes - Project on-going • Completed the tank 80 headspace nitrogen inerting system

  6. VMT Operational Status • BWT Tank 92 Spill • Temporary patch installed • Root Cause Analysis completed, and under review • Smoking incident • Safety Stand-downs conducted • Investigation conducted • Hydrotek steam cleaner incident • Investigation in process • Otter Hospital • Set up completed in 48 hours; C-Plan compliance requires 72 hours

  7. VMT Operational Status Continued • Power/Vapor “B” Boiler • Corrosion discovered during scheduled inspection • Extent of condition under evaluation • The east potable water plant and VFF are fully operational • High turbidity from Allison Creek from the 2006 Flood impacted the operation • Berth 4 and Berth 5 quarterly maintenance was completed • Fierce Conversations training