An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Xcel Energy Projects From 2008 Reliability Assessment

  2. Douglas Co 2nd Transformer: • Low voltages in the region for the loss of Douglas Co transformer. • Install a 2nd Douglas Co 115/ 69 kV transformer. • Planned inservice date is ~ 2011

  3. Monticello Transformer Upgrade: • Loss of Sherco – Benton 345 kV line overloads Monticello 345/230 kV transformer. • Upgrade the existing transformer to 550 MVA. • Inservice date ~ 2011.

  4. Sioux Falls Area Upgrades • Add second 112 MVA transformer at Lawrence • ISD – 12/1/2012 • Split dbl ckt 115 kV line from Split Rock-Cherry Creek/West Sioux Falls • ISD – 6/1/2011 • Solves low voltages and transformer overloads

  5. South Minneapolis Electric Reliability Project (SMERP) To Lexington New HWY 280 345/ 115kV sub 2013 2-672 MVA @ Parkers Lake 2015 115 kV line 2013 Open Elliot Park-Hiawatha line 2013-2020 345 kV line 2013-2020 New Hiawatha sub 2010 and Midtown sub 2010 New Crosstown sub 2014 Dbl ckt 115 kV line 2014 2-672 MVA @ Red Rock 2013 2-672 MVA @ Eden Prairie 2014

  6. Cannon Falls Area Upgrades • Loss of either Cannon Falls transformer overloads the other transformer. • Add a 115/69kV 112MVA transformer at Colville substation. • Reroute Cannon Falls-Byllesby 69kV line to Colville-Byllesby. • Replace bus tie breaker with a breaker ring bus at Cannon Falls. • ISD – 6/1/2012