Xcel Energy Smaller Scale Transmission Projects. Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline. Small Project Information. T-Corners Transformer Replacement Hyland Lake – Dean Lake 115 kV Upgrade Woodbury – Tanners Lake Upgrade
E N D
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline
Small Project Information • T-Corners Transformer Replacement • Hyland Lake – Dean Lake 115 kV Upgrade • Woodbury – Tanners Lake Upgrade • Northeast Mankato 69 kV Plan • South Shakopee Substation • Ironwood Second Transformer • Ironwood Bus Upgrade • Lawrence Second Transformer • Tracy Switching Station Capacitors • Keegan Lake – Lebanon Hills • Prescott 10 MVAR Cap Bank
T-Corners 115/69 kV Transformer Replacement • Substation currently has two 115/69 kV transformers (#1 & #2) • Tx #1 – 62.5 MVA • Tx #2 – 112 MVA • Summer 2011 – Loss of Transformer #2 will load #1 to 80 MVA (128%) • Plan to replace existing 62.5 MVA bank with matching 112 MVA bank
52 Miles T-Corners 115/69 kV Transformer Replacement T-Corners Eau Claire Metro Area
Ironwood Second Transformer • Ironwood 88/34.5 kV Transformer currently rated at 25 MVA • 78 MW generation at Bayfront Substation • Loss of Bayfront 115/92 kV transformer sends Bayfront generation through 88 & 34.5 kV systems • Severely overloads Ironwood – Bayfront 88 kV line • Severely low voltages along Ironwood 34.5 kV system • Add second Ironwood 88/34.5 kV transformer
Ironwood Terminal Equipment Upgrade • Ironwood – Bayfront 115 kV conductor rated at 189 MVA (850 Amps) • Ironwood 115 kV substation equipment with various ratintgs • 200 Amp CT • 300 Amp Wave Trap • 380 Amp Bus • 400 & 800 Amp Breakers, 600 Amp Switches • Outage of Bayfront – Saxon Pump 88 kV line loads Ironwood 115 kV to 72 MVA (361 Amps) • Outage of Bayfront 115/92 kV transformer loads Ironwood 115 kV to 87 MVA (437 Amps) • Replace capacity-limiting terminal equipment
Lawrence Second 112 MVA Transformer • This project is to add an additional 115/69 kV, 112 MVA transformer at the Lawrence Substation in Sioux Falls. This is needed due to the double-circuit outage of the 115 kV line out of Split Rock to Cheery Creek. • In Summer 2011, loss of Split Rock-Cherry Creek and Split Rock-West Sioux Falls double-circuit outage results in a loading of 145.9 MVA (130.2%) of the 112 MVA transformer at Lawrence.
Tracy SW 12 MVAR CAP • This project is to replace the existing 5.4 MVAR, 69 kV cap bank at the Tracy Switching Station with a new 12 MVAR cap bank. • In Summer 2006, for loss of the Lyon County 69 kV source, the following buses have low voltage: Walnut Grove = 0.855 pu Tracy SS = 0.856 pu Lake Sarah = 0.860 pu Currie = 0.872 pu Slayton = 0.886 pu Hadley = 0.898 pu Lake Wilson = 0.905 pu
Kegan Lake – Lebanon Hills 69 kV Line Upgrade • Reconductor the 3 #8 CU section of the Kegan Lake – Lebanon Hills 69 kV line to at least 48 MVA. • During 2011 summer peak conditions, the line overloads to 110.5% in the base case.