1 / 15

New xTCA Developments at SLAC

New xTCA Developments at SLAC. CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory. Lexicon. xTCA – Includes large board ATCA system favored by Telecom and small board AMC MicroTCA shelf with extensions for Physics

alissa
Download Presentation

New xTCA Developments at SLAC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments at SLAC - R. Larsen

  2. Lexicon xTCA – Includes large board ATCA system favored by Telecom and small board AMC MicroTCA shelf with extensions for Physics AMC – Advanced Mezzanine Card in MicroTCA or ATCA Carrier Board RTM, μRTM – Rear Transition Module for ATCA or MicroTCA IPMI – Intelligent Platform Management Interface, core feature of xTCA managed systems SM – Shelf Manager card, 2 used in redundant shelf, non-payload slot LCLS – Linac Coherent Light Source newest generation light sources at SLAC, LCLSI operating, LCLSII approved for construction start 2013 BPM – Accelerator Strip-line or Cavity Beam Position Monitor, typically 4 channels with online calibration between beam pulses PICMG3.8 – New Physics standard for interface from ATCA to RTM MTCA.4 – Complete new 2-wide AMC standard with RTM for MicroTCA AIP – Accelerator Improvement Program New xTCA Developments at SLAC - R. Larsen

  3. I. Standards Progress • Hardware, Software Technical Committees formed under PICMG • 2 new HW standards approved • ATCA • PICMG3.8 Standard IO interface to Rear Transition Module (RTM), IPMI extension & power connector • MTCA • MTCA.4 Crate, 2-wide AMC & RTM, IO interface, IPMI extension and power pins designated New xTCA Developments at SLAC - R. Larsen

  4. Standard Extensions for Physics New xTCA Developments at SLAC - R. Larsen

  5. PICMG3.8 RTM Interface Standard Rear View 120 - IO Channels (3x40) IPMI, Power Connector (blue) 2 Mechanical Keys Courtesy M. Huffer, SLAC New xTCA Developments at SLAC - R. Larsen

  6. MTCA.4 Prototype Shelves & Modules Emerging New Electronics Standards - R. Larsen

  7. MTCA.4 - 12 Slot Shelf Dual Star Back-Plane Dual PU slot Dual MCH Slot 12 Payload AMC-RTMs Dual Star Redundant Front View New xTCA Developments at SLAC - R. Larsen

  8. II. SLAC xTCA Initiatives • Major SLAC program is Linac Coherent Light Source(LCLS) Machines • LCLSI (now operating using last1/3 of main linac) • LCLSII (just approved, using middle 1/3 of linac) • Each machine supports 6 or more large experimental areas (much larger than storage ring light source experiments) • Linac machine instrumentation needs lots of upgrades via Accelerator Improvement Programs (AIPs) New xTCA Developments at SLAC - R. Larsen

  9. SLAC Initiatives 2 • Experimental Areas • ATCA Massively Parallel Processors (MPP) generic module already deployed in several LCLSI experiments; 2nd generation MPP using new PICMG 3.8 interface • Linac RF & Controls • MTCA.4 demonstrations in development include • Reduced RF phase jitter to ~30 femtoseconds • Klystron FPGA-based interlocks • Beam Position Monitors for LCLSII Injector New xTCA Developments at SLAC - R. Larsen

  10. xTCA Status • LLRF for Main Linac S-Band 50MW station • Prototype developed, accelerator test planned for October 2011 (AIP program) • Struck digitizer AMC w/ SLAC designed RTM • Klystron Interlocks • Prototype development near completion, test planned on L-Band test station Q1-2 FY12 • TEWS FPGA AMC w/ SLAC designed RTM • BPM System • AIP program approved, commercial AMC digitizer w/ SLAC designed RTM, requirements in development New xTCA Developments at SLAC - R. Larsen

  11. LLRF MTCA & RF Chassis Testing RTM Section AMC Section RF head-end chassis in bench test MTCA.4 6-slot with AMC FPGA digitizer, timing, processor controlling intra-pulse feedback loop μRTM rear view New xTCA Developments at SLAC - R. Larsen

  12. RTM 10 Ch ADC-DAC, IPMI Interface • Rear Panel • 25 MHz IF Signals In • RF Ref In • Trigger in • Dual I&Q DAC Out Courtesy A. Young, SLAC Emerging New Electronics Standards - R. Larsen

  13. RTM FPGA Interlocks • REAR PANEL • INPUTS • DC and pulsed signals • 2 KSps and 60 MSps 12bit digitizers on board • OUTPUTS • Multiplexed serial to AMC via RTM interface • Works for short pulse or long pulse machines Courtesy D.G. Brown, SLAC Emerging New Electronics Standards - R. Larsen

  14. 8- BPM System Block Diagram EVR – Event Receiver (trigger over serial network) ADC – AMC BPM digitizer & FPGA processor, Industry units AFE – Analog Front End RTM (buffers, filters, calibration circuits Courtesy S. Hoobler et al, private communication New xTCA Developments at SLAC - R. Larsen

  15. Conclusions • PICMG3.8, MTCA.4 are major milestones • Software work continues • Guidelines on architecture, protocols; need active feedback from user case studies • SLAC Initiatives • ATCA Generic Massively Parallel Processors working in LCLSI experiments, Improved version in process • MTCA Opportunities underway to evaluate for three major subsystems • Industry providing infrastructure modules and key applications modules, SLAC designing first RTMs successfully • Goal is readiness for major LCLS system upgrades • Both lab and Industry COTS solutions critical New xTCA Developments at SLAC - R. Larsen

More Related