An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. xTCA evaluation activities at CERN Collaboration (PH/ESE) Vincent Bobillier, Stefan Haas, Markus Joos, Francois Vasey, Paschalis Vichoudis and from October on a VIA fellow vincent.bobillier@cern.ch

  2. xTCA evaluation activities at CERN • uTCA evaluation • Assess µTCA for it suitability as a platform for future modular electronics for HEP experiments. • Tasks: • Technical evaluation of components for µTCA and MTCA.4 systems • Development of tools (H/W and S/W) for the testing of commercial components • Conduct market surveys • Report results to the xTCA IG (https://twiki.cern.ch/twiki/bin/view/XTCA/WebHome) • Build up support for components of common interest • Shelves, • MCH, • MMC, • Power modules • Possibly processor AMCs • Project started: February 2011 vincent.bobillier@cern.ch

  3. xTCA evaluation activities at CERN uTCA equipment purchased and evaluated 2 5 3 6 4 1 vincent.bobillier@cern.ch

  4. xTCA evaluation activities at CERN Equipment developed MMC test AMC MMC mezzanine (based on design from CPPM) Available for interested users AMC load board RTM load board vincent.bobillier@cern.ch

  5. xTCA evaluation activities at CERN uTCA evaluation results • Many (mostly minor) interoperability problems encountered (IPMI related) • Components providing the same function (e.g. shelf or MCH) can have very different features and user interfaces (S/W) • µTCA seems to be growing rapidly • Large choice of shelves, MCHs, processors, FPGA/FMC AMCs • Also some digitizers available now • MTCA.4 received well by OEMs • Many customizations • Special signal routing on backplanes • Backplanes with integrated MCH functionality • Many options (cooling, PSUs, data transfer protocols) • For the detailed report see: https://espace.cern.ch/ph-dep-ESE-BE-uTCAEvaluationProject/Shared%20Documents/xTCA%20summary.docx vincent.bobillier@cern.ch

  6. xTCA evaluation activities at CERN uTCA evaluation results Crate PSU tests and measurements Regulation and ripple measurements Long term measurements with load variations and temperature monitoring Detailed report here: https://espace.cern.ch/ph-dep-ESE-BE-uTCAEvaluationProject/Shared%20Documents/PS_Quality_uTCA_crates.docx vincent.bobillier@cern.ch

  7. xTCA evaluation activities at CERN Project extension to include ATCA • Main focus on the infrastructure: • PSU performance • Cooling performance (in particular vertical cooling, potentially required for the racks in the LHC experiments) • Shelf management and IPMI communication • Next equipment to acquire and evaluate • ATCA shelf with SHMM (shelf-management module) • Power converter unit (AC to -48V) • ATCA load boards + load RTMs(number to be defined) vincent.bobillier@cern.ch

  8. xTCA evaluation activities at CERN Next steps • Complete the tasks of the first µTCA phase (MMC S/W, µTCA tests and measurements) • Continue evaluation of µTCA MCH modules (and processor AMCs) • Continue the market surveys • Maintain contacts with (potential) users via e.g. the xTCAIG (The next meeting of the xTCA IG will be at TWEPP 2012) • Continue and expand the project with these objectives: • Pay equal attention to µTCA and ATCA • Focus efforts of PH/ESE on infrastructure components • Shelves and Power supplies (with focus on electrical and cooling performances) • Keep close contact with the xTCA projects in the experiments to better understand their requirements • Propose procedures for the acceptance testing of (commercial) xTCA components vincent.bobillier@cern.ch