New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments at SLAC - R. Larsen
Topics Standards developments Applications Demonstration Program Future Plans New xTCA Developments at SLAC - R. Larsen
Standards • Hardware, Software working groups meet weekly/ needed • 2 new HW standards approved • ATCA • PICMG3.8 Standard IO interface to Rear Transition Module (RTM), IPMI extension & power connector • MTCA • MTCA.4 Crate, 2-wide AMC & RTM, IO interface, IPMI extension and power pins designated New xTCA Developments at SLAC - R. Larsen
Standard Extensions for Physics New xTCA Developments at SLAC - R. Larsen
Standards Details • ATCA PICMG3.8 • 120 5GHz BW IO channels on 3- 4x10 ZD connectors • New connector (Positronix) for IPM, power • Mechanical, E-keying functions • Implemented on SLAC MPP Processor (M. Huffer) • MTCA.4 • Extends double-wide shelf (crate) to include RTM • 60 ChIO, IPMI on 2- 3x10 ZD connectors • Extended backplane timing, trigger, interlocks layer • Compatible with all existing 1-wide AMC products • Implemented by Schroff, ELMA, PT, others in dev’mt New xTCA Developments at SLAC - R. Larsen
PICMG3.8 RTM Interface Standard Rear View 120 - IO Channels (3x40) IPMI, Power Connector (blue) 2 Mechanical Keys Courtesy M. Huffer, SLAC New xTCA Developments at SLAC - R. Larsen
MTCA.4 AMC-RTM-Shelf Concept New xTCA Developments at SLAC - R. Larsen
MTCA.4 12-AMC Backplane Intlk, Vector Sums Parallel Triggers New xTCA Developments at SLAC - R. Larsen
MTCA.4 Backplane Timing Distribution 2 radial clocks per AMC,low jitter MCH Cross- Point-Switch Backplane Central Timing AMC Timing AMC ADC AMC ADC Enc.Clock Enc.Clock Trigger Trigger Interlock Interlock 8 bussed lines,M-LVDS for Clocks, triggers, interlocks Courtesy K. Rehlich, DESY New xTCA Developments at SLAC - R. Larsen
µRTM Extended IPMI Circuit New xTCA Developments at SLAC - R. Larsen
MTCA.4 Prototype Shelves & Modules Emerging New Electronics Standards - R. Larsen
MTCA.4 - 12 Slot Shelf Dual Star Back-Plane Dual PU slot Dual MCH Slot 12 Payload AMC-RTMs Dual Star Redundant Front View New xTCA Developments at SLAC - R. Larsen
MTCA.4 - 6-Slot Shelf Non-Redundant 6 Slot Development Shelf 1-Star Non- Redundant Front View 6-Slot Rear View Courtesy Schroff, Struck New xTCA Developments at SLAC - R. Larsen
SLAC Applications Demonstrations LLRF for Main Linac S-Band 50MW station Klystron interlocks for 10MW L-Band station Beam Position Monitors for LCLSII Injector New xTCA Developments at SLAC - R. Larsen
1. S-Band LLRF • Demonstrate intra-pulse feedback to achieve ~30fs phase control • Lower noise RF front end chassis • New solid state sub-booster • Feedback loop implemented in MTCA.4 using Struck 10 Ch ADC 2 Ch DAC developed w/DESY • New LCLSI waveguide water-stabilized rack • Test on Standby triggering, switch to Accelerate • Tests on accelerator to complete Oct 2011 New xTCA Developments at SLAC - R. Larsen
LLRF MTCA & RF Chassis Testing New xTCA Developments at SLAC - R. Larsen
Rear View New xTCA Developments at SLAC - R. Larsen
RTM Inputs Note – Preliminary RTM shown Final RTM with full IPMI complete, In test. New xTCA Developments at SLAC - R. Larsen
RF Chassis – Reference, LO, Sources, Downmixers Note – Next stage plan is to test L-Band down-mixers, other RF modules in MTCA card format New xTCA Developments at SLAC - R. Larsen
AMC - 10/2Ch ADC/DAC 16bit 125 MSPS Initial Applications: LLRF DESY XFEL LLRF SLAC Upgrade Proto Photo courtesy M. Kirsch, (Struck ) Emerging New Electronics Standards - R. Larsen
RTM 10 Ch ADC-DAC, IPMI Interface • Rear Panel • Mini-Coax IF Signals In • RF Ref In • Trigger in • Dual I&Q DAC Out • IPMI Extension to RF Chassis Courtesy A. Young, SLAC Emerging New Electronics Standards - R. Larsen
2. MTCA Klystron Interlocks S&L Band • FPGA based interlocks in MTCA.4 • S-Band interlocks currently in separate FPGA non-modular chassis • L-Band interlocks currently FPGA based in VME • MTCA solution will serve both in future • SLAC designed RTM mates to new TEWS Spartan 6 FPGA module (just received in US) • RTM testing starting • 1 board pair serves 8 Ch-60MSps, 16 Ch-2KSps • 2 board pairs serve 1 S- or L-band station New xTCA Developments at SLAC - R. Larsen
RTM FPGA Interlocks • Rear Panel • Inputs • - 8-60 MSps Ch • - 16-2 KSps Ch • - 12 bits Diff +/- 1V • - Diode protection • All channels • Outputs • - Interlock Sums • RF Interlocks for • L-Band 1 msec, S-band 1.5 µsec Courtesy D.G. Brown, SLAC Emerging New Electronics Standards - R. Larsen
AMC TAMC651 FPGA w/RTM Courtesy TEWS Note – Completion date for ESB installation Dec. 2011. New xTCA Developments at SLAC - R. Larsen
3. BPMs for LCSLII Injector • Goal: Demonstration of 8 BPMs in 12-slot • RTM has 4 Ch analog plus calibration w/ strip-line coupling between 120 Hz pulses • AMCs will be 4 Ch 125 or 250 MSps (125 available now; 250 may be developed by commercial supplier(s) • 250 MSps needed if multibunch (2 bunches 8 nsec apart) • Requirements being finalized (16 bit ADCs) • Preliminary RTM layout indicates feasible New xTCA Developments at SLAC - R. Larsen
BPM System Block Diagram Courtesy S. Hoobler et al, private communication New xTCA Developments at SLAC - R. Larsen
Conclusions 1 • Standards for hardware have passed 2 major milestones • Committees will disband when SOWs complete • Software committee continues developing guidelines for architecture and protocols • Member labs remain involved in PICMG through Coordinating Committee for oversight, servicing tweaks • Start new initiatives, SOWs, form committees as needed New xTCA Developments at SLAC - R. Larsen
Conclusions 2 • SLAC new initiatives open future opportunities • Main Linac RF upgrades for LCLSII, I. • BPM upgrades for LCLSII Injector, Main Linac • Interlock systems wholly contained in MTCA.4 combined RF-Controls package • Long range: Complete replacement CAMAC controls in 2-mile accelerator, $20M program • Timeline: • RF and interlock demos complete in Q1-2 FY12 • BPM AIP completes Q2 FY13 New xTCA Developments at SLAC - R. Larsen