1 / 14

Knowledge Creation and Virtual Enterprises in Power Plant Construction

Knowledge Creation and Virtual Enterprises in Power Plant Construction. Pekka Välikangas & Jari Puttonen Fortum Engineering Ltd. Knowledge Creation and VE in Power Plant Construction. Managing product life cycle information Product and activity models Knowledge Creation Environment (KCE)

Download Presentation

Knowledge Creation and Virtual Enterprises in Power Plant Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Knowledge Creation and Virtual Enterprises in Power Plant Construction Pekka Välikangas & Jari Puttonen Fortum Engineering Ltd

  2. Knowledge Creation and VE in Power Plant Construction Managing product life cycle information Product and activity models Knowledge Creation Environment (KCE) • Information collection process • Evolution of knowledge • Collection of tacit knowledge • Distribution of information in VE • Use of product and activity models in KCE Use of KCE in power plant project • Description of VE • Knowledge exchange in VE Conclusions

  3. Client require- ments require- ments As-operated As-O&M As-required updates pre-design pre-design General info - procurement - technical concepts Product control - operation - maintenance - warranty Operate and maintain (O&M) power plant. A26 Managing product life cycle informationof power plant Production & delivery Operation status Pre- status information information qualification As-built info A21 As-designed info Design process plan As-built Planning & control - project mngmt - procurement Pre-tender Pre-tender updates planning and design design Supplier Detail Detail A22 performance Plan and manage production, procurement and further operation and maintenance instructions design design of power plant feedback A23 Initial pre-plans: - production plan - procurement - commissioning - maintenance A24 Detail Detail design design of O&M A25 Contract awarded Commissioned Operation Tendering Delivery

  4. Product and Activity Models

  5. Information Collection Process

  6. Evolution of Knowledge

  7. Collection of Tacit Knowlege

  8. Distribution of Information in VE

  9. Use of Product and Activity Modelsin KCE

  10. Use of KCE in Power Plant Project

  11. Description of Co-operation in VE • Connections between descriptions • business goals • technical scope • simulation Simulation

  12. Description of information in VE

  13. Knowledge Exchange in VE

  14. Summary KCE as a concept for defining VE • advanced support for co-operation in VE KCE for harmonising data exchange in VE • support for robust data exchange in accordance with business and product descriptions KCE for publishing information in VE • Structured explanative descriptions beside the actual data

More Related