1 / 10

ISE 6 Phase 2 Demo Scenario

ISE 6 Phase 2 Demo Scenario. Sept 11, 2008 NSWC CD. Current Issues. Confirm data exchange scenario Define level of NSWC PHD / Raytheon participation Discuss details of IPT CAD modeling Start to define demo data HVAC system HVAC system PLCS logistics data HVAC system S1000D modules.

Download Presentation

ISE 6 Phase 2 Demo Scenario

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD

  2. Current Issues • Confirm data exchange scenario • Define level of NSWC PHD / Raytheon participation Discuss details of IPT CAD modeling • Start to define demo data • HVAC system • HVAC system PLCS logistics data • HVAC system S1000D modules

  3. ISE 6 Phase 2 Demo Scenario • Dual Band Radar, provided by NSWC PHD, is incorporated into LPD 17 and DDG 1000 design. • Export selected Dual Band Radar system from LPD IDE as PLCS data with S1000D data modules • PLCS data modified to allow importation into DDG 1000 IDE • PLCS data imported into DDG 1000 IDE • New Mod of Dual Band Radar is developed and authorized for use • New radar cabinets generate more heat, require additional cooling in the space • New cooling requirements passed to Shipyard Engineering • HVAC system is redesigned • Affected S1000D data modules for HVAC system IETM are updated • HVAC system IETM updated • Updated design passed to LEAPS

  4. PLCS & S1000D: Functional Scenario Shipyard A IDE (Design, Logistics, Support) Navy IDE (Design & Analysis) Data Prep & QA (Design, Logistics, & CAD) Shipyard B Design (3D CAD Data) Navy ISEA (GFE Change) Shipyard B IDE (Update Tech Pub)

  5. LEAPS Navy Design & Analysis Repository AIM/SIR LPD 17 IPDE Software PLCS & S1000D: Exchange Scenario Shipyard A IDE Navy IDE AP 239 + S1000D episTree Knowledge Management AP 239 + S1000D Software AP 227 HVAC 3D Design Shipyard B IDE Teamcenter DDG 1000 IDE Software AP 239 Radar data Ship Alt Changes Design ShipConstructor AP 227 HVAC 2008 NAVSEA / Navy ISEA ShipConstructor New Support Requirements Common Source DB 2006

  6. HVAC Sys DM 1.1 HVAC Sys IETM 2 HVAC Ducts HVAC Sys Drawing1 HVAC Sys IETM 1 DM 1.2 HVAC Sys Drawing2 DM 2.2 Chillers Duct 2 DM 1.1 Mod 1 Radar IETM DM 1.3 Chiller 1 Mod 1 DM 1.2 DM 2.3 Chiller 2 DM 1.3 Mod 2 Mod 2 Radar IETM DM 2.1 DM 2.2 PLCS & S1000D: Data Scenario Shipyard Design & IDE ISEA IDE (Radar) Duct 1 Updated Requirements

  7. Demo Data • HVAC system PLCS data • Similar to last year’s demo • Equipment – chiller? • AP 227 implications • HVAC system Tech Manual / Data Modules • Need to define minimal TM content, divide into DM • Define DMC structure • Define necessary metadata

  8. Backup

  9. AP239/PLCS (ISE-6 Phase 1) Demo Scenario LEAPS Navy Design & Analysis Repository AP 214 AP 239 Shipyard A - IDE AP 239 AIM/SIR LPD 17 IPDE Software Navy IDE Design ShipConstructor 2008 AP 227 CATIA ShipConstructor AP 227 (V4 AEC) 2006 3D Design Design & Logistics episTree Knowledge Management Software Shipyard B - IDE AP 239 Design & Logistics AP 214 Teamcenter Design & Logistics, including 3D Design DDG 1000 IDE Software

  10. PLCS & S1000D: Functional Scenario Navy ISEA (GFE Change) Navy IDE (Design & Analysis) Shipyard A Design (3D CAD Data) Shipyard A IDE (Update Tech Pub) Data Prep & QA (Design, Logistics, & CAD) Navy Depot (Design, Logistics, Support)

More Related