1 / 22

ISE 6 Phase 2 Demo Scenario

ISE 6 Phase 2 Demo Scenario. Nov 20, 2008. Stakeholders. ISEA NSWC PHD (Combat Systems ) NSWCCD SSES (HM&E ) Program Offices PMS 500, etc. IWS 1 (Combat Systems ) IWS 2 (Above Water Sensors ) PEO Ships Policy Makers NAVSEA 04L OPNAV N40

berke
Download Presentation

ISE 6 Phase 2 Demo Scenario

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISE 6 Phase 2 Demo Scenario Nov 20, 2008

  2. Stakeholders • ISEA • NSWC PHD (Combat Systems) • NSWCCD SSES (HM&E) • Program Offices • PMS 500, etc. • IWS 1 (Combat Systems) • IWS 2 (Above Water Sensors) • PEO Ships • Policy Makers • NAVSEA 04L • OPNAV N40 • Shipyards (Acquisition and Planning Yard)

  3. Invitation List • Jim Colson (Army LOGSA) • 04L - Bernie Coval, Tim Kriegal, Bucky Buchanan • ISW1 – Jolene Marshall, CAPT Mall • ISW2 – Noel Smith, • PMS 500 – Cheryl Smorto, • Claude Barrens (CGX ship design manager) • NAVSSES – Joe Picossi • PHD – Troy Sutton, Fabio Vitale, CAPT Ruehlin • PEO Ships • PEO Subs • PEO Carriers

  4. Demo Date • Phillys in DC April 13-16 • Easter is April 12

  5. Process Improvements • Exchange of integrated design and logistics product data • Between Design and Logistics • Between ISEA, NAVSEA 05, Shipyards, and OEMs • Throughout full life cycle (currently only in acquisition) • Standardized data exchange formats • Neutral format IDE data • Improved quality and reduced cost through standardized schema and automated validation/exchange • Enable data reuse • Automated identification of change impacts • Reduce costs to evaluate changes • Support cost benefit analysis, design trade studies, etc. • Impact of design or logistics changes • Enables Virtual Navy Enterprise

  6. As-is Scenario Program Office Authorization, Funding OEM (RSC) Authorization, Funding LSAR Collaboration Develop ECR Revised Radar Shipyard / NAVSSES Revised HM&E Data Update Design and Logistics Revised Radar Data Update Design and Logistics ISEA (PHD) LSAR Identify Changes Program IDE Changes Mod 2 Radar NDE-FMP NAVICPWSF Navy S1000D Database (Content@) LEAPS CDMD OA TDMIS

  7. Demo Scenario Program Office(s) Authorization, Funding OEM (RSC) Authorization, Funding LSAR Collaboration Develop ECR Revised Radar AP 239 + S1000D Update Design and Logistics Shipyard / NAVSSES Revised HM&E Data ISEA (PHD) Revised Radar Data Update Design and Logistics AP 239 + S1000D AP 239 + S1000D LSAR Program IDE Identify Changes Changes PLCS AP 239 + S1000D AP 239 + S1000D NDE-FMP NAVICPWSF Navy S1000D Database (Content@) LEAPS CDMD OA TDMIS

  8. Demo Scenario by System Need to add S1000D repository From OEM and Shipyard Program Office(s) Authorization, Funding OEM (SIR) S1000D modules Authorization, Funding LSAR Collaboration Develop ECR AP 239 + S1000D Revised Radar Update Design and Logistics Shipyard / NAVSSES Revised HM&E Data ISEA (episTree) Revised Radar Data Update Design and Logistics AP 239 + S1000D AP 239 + S1000D LSAR Program IDE (Teamcenter) Identify Changes Changes PLCS AP 239 + S1000D AP 239 + S1000D NAVICPWSF LEAPS Navy S1000D Database (Content@) CDMD OA TDMIS NDE-FMP

  9. In-service Ship Alt • PEO authorization • SHIPMAIN coordinates development of Alt • ISEA develops Alt for radar system • ISEA submits ECR to OEM • Update design (drawings) • Update logistics (ILS) • Planning yard / NAVSSES develop Alt for HM&E • Update design (drawings) • Update logistics (ILS)

  10. Current Issues • Investigate LOGSA LSAR DEX – Tim, Ted, Mike

  11. Clarifciations • Separate Ship Constructor demo • Maybe ShipTech • Different audiuence – 2nd tier yards

  12. Demo Data • Content@ DB • John Crehan to work with Bernie • End of Jan – link from RSC is operational to deliver modules • Fall back plan – manually add to Content@ • Dual Band Radar • Receiver Exciter (REX) Spy 3 • 30 data modules • Functional description, Removal, Procedure, graphics • John Crehan provide metadata by Dec 5 • Matt P. – acquire LCB data, including HSC numbers

  13. Demo Data • HM&E system • Use AC system (514) • Use AC Plant #1 (51421) • Change the motor (514212122) and compressor (514212121) • Mike talk to Harold Roll about S1000 DM for AC plant • Ben – find additional VFI tech data for motor and compressor • Tim – find out who has S1000D data for LPD 17 motors • Populate data sheet • CAD model for equipment • Could export from CATIA • Need GUIDS for LEAPS • Mike – Provide STEP files for distributed systems

  14. Previous Demo Planning Slides

  15. ISE 6 Phase 2 Demo Scenario • Initial Data Exchange and Load • Export selected HVAC system from LPD IDE as PLCS data with links to S1000D data modules • Export selected Dual Band Radar (DBR) system from NSWC PHD/Raytheon (System TBD) as PLCS data with links to S1000D data modules • PLCS data modified to allow import into DDG 1000 IDE • PLCS data imported into DDG 1000 IDE • S1000D data and publication modules for HVAC and DBR delivered to Navy Common Source Data Base (CSDB) • Change Management • New Mod of Dual Band Radar is developed and authorized for use • New radar cabinets generate more heat, require additional cooling in the space • New cooling requirements passed to Shipyard Engineering • HVAC system is redesigned • Affected S1000D data modules for HVAC and DBR system Technical Manuals are updated • HVAC and DBR system Technical Manuals updated • Updated design passed to LEAPS

  16. PLCS & S1000D: Functional Scenario Shipyard A IDE (Design, Logistics, Support) Navy IDE (Design & Analysis) Data Prep & QA (Design, Logistics, & CAD) Shipyard B Design (3D CAD Data) Navy ISEA (GFE Change) Shipyard B IDE (Update Tech Pub)

  17. Shipyard A IDE Navy IDE LEAPS Navy Design & Analysis episTree Repository Shipyard B IDE AIM/SIR LPD 17 IPDE Software NAVSEA / Navy ISEA CAD Tool PLCS & S1000D: Exchange Scenario AP 239 + S1000D S1000D Modules Knowledge Management AP 239 + S1000D Software AP 214 HVAC 3D Design NAVSEA / NSWCCD Teamcenter Common Source DB DDG 1000 IDE Software Candidate Data Module Updates Content@ Ship Alt Changes S1000D Modules AP 239 + S1000D Design Shipyard TBD System New Support Requirements

  18. HVAC Sys DM 1.1 HVAC Sys TM 2 HVAC Ducts HVAC Sys Drawing1 HVAC Sys TM 1 DM 1.2 HVAC Sys Drawing2 DM 2.2 Chillers Duct 2 DM 1.1 Mod 1 Radar TM DM 1.3 Chiller 1 Mod 1 DM 1.2 DM 2.3 Chiller 2 DM 1.3 Mod 2 Mod 2 Radar TM DM 2.1 DM 2.2 PLCS & S1000D: Data Scenario Shipyard Design & IDE ISEA IDE (Radar) Duct 1 Updated Requirements

  19. Demo Data • HVAC and DBR system PLCS data • Similar to last year’s demo • Equipment – chiller? • AP 227 implications • HVAC and DBR system Tech Manual / Data Modules • Need to define minimal TM content, divide into DM • Define DMC structure • Define necessary metadata

  20. Backup

  21. AP239/PLCS (ISE-6 Phase 1) Demo Scenario LEAPS Navy Design & Analysis Repository AP 214 AP 239 Shipyard A - IDE AP 239 AIM/SIR LPD 17 IPDE Software Navy IDE Design ShipConstructor 2008 AP 227 CATIA ShipConstructor AP 227 (V4 AEC) 2006 3D Design Design & Logistics episTree Knowledge Management Software Shipyard B - IDE AP 239 Design & Logistics AP 214 Teamcenter Design & Logistics, including 3D Design DDG 1000 IDE Software

  22. PLCS & S1000D: Functional Scenario Navy ISEA (GFE Change) Navy IDE (Design & Analysis) Shipyard A Design (3D CAD Data) Shipyard A IDE (Update Tech Pub) Data Prep & QA (Design, Logistics, & CAD) Navy Depot (Design, Logistics, Support)

More Related