Fire Sprinkler International 2014 Name: Andreas Teckenburg London, 20. May 2014

Fire Sprinkler International 2014 Name: Andreas Teckenburg London, 20. May 2014. Fire Protection Solutions for Transformers „ TrafoProtect “ by Minimax. Agenda. Initial Situation Goal setting Trials Fire Extinguishing Concept TrafoProtect. „The risk “. 1) Initial Situation.

amil
Download Presentation

Fire Sprinkler International 2014 Name: Andreas Teckenburg London, 20. May 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fire Sprinkler International 2014 Name: Andreas Teckenburg London, 20. May 2014 • FireProtection Solutions for Transformers„TrafoProtect“ by Minimax 8 von 36

  2. Agenda • Initial Situation • Goal setting • Trials • FireExtinguishingConceptTrafoProtect 9 von 36

  3. „The risk“ • 1) Initial Situation • Protectivegoals: • Avoiddamagetopersons • Reducedamagetoenvironment • Reducebusinessinterruptions • Protect material asset • Avoidlossofimage • Obtainjobs • Malfunctionmechanismsoftransformers: • Mechanicalloadbyforcesofelectricalshortage in windings • Electricalloadby transient excessvoltage • Mechanicaldefectsoftheloadlevelswitch • Defectof a conduct • Thermicalorelectricalagingoftheisolators 10 von 36

  4. Different Guidelines/ Rules • 1) Initial Situation • European Approach: • VdS 2109 VdS-Richtlinien für Sprühwasser-Löschanlagen, Planung und Einbau • TS 14816 European technical Specification, Fixed fire fighting systems - Water spray systems - Design, installation and maintenance • US Approach: • NFPA 15 Water Spray fixed systems for fire Protection • NFPA 11 Low-, medium- and high Expansion foam system • FM 4-1N Fixed water spray systems for fire protection • FM 5-04 Transformers 10 von 36

  5. Different design parameters • 1) Initial Situation national / international • VdS 2109 (12.4): • Waterapplication: 15 - 30 mm/min • Operating time: 5 min (Step-in-time ofthefiredepartment) • NFPA 15 (7.4.4): • Waterapplicationtransformerandaccessories: 10,2 mm/min • „Endangeredterrainsurface“: 6,1 mm/min • Operating time: „As longastheexpositionstops.“ • NFPA 11 Schaumlöschanlagen: • Protectionoftansformerswith medium foam. Nodesigning. • FM DS 5-04: • In rooms (2.2.1.2.2) withsprinklerat15 mm/min or FM-approved„Machineprotectivesystem“. 12 von 36

  6. Agenda • Initial Situation • Goal Setting • Trials • FireExtinguishingConceptTrafoProtect 9 von 36

  7. 2) Goal Setting „Creationof a protectionconcept valid andcertifiedinternationallywhichenablesthe „economicallypriced“ fireprotectionoffree-standing transfordermswithpreferablysmall design parameter.“ • Protectionoftransformers; also for„decentral“ substations (municipial utilities, etc.)  Influenceof wind ? • Ifnosufficientwatersupply (amount, pressure) isexisting (existence, newbuilding) • Protectionoftransformerswithlessextinguishingwater. Mostlythetransformeristhe „waterdetermining“ component in thewholeproject. • Reducingof „contaminated“ extinguishingwater. • „The Scope“ 11 von 36

  8. InspectionandCertificationofthe Installation Engineering • 2) Goal setting Courseoftheprocedure: • Collocationofinformationandrequirementsofthetestingcenters, but also theoperatorsandinsurer (e.g. HDI Gerling) • Preparationof a testconceptbyDMT • Set-up DMT / UL • ExecutionofthetestsatDMT • Creationoftheplanningandinstallationinstructions 12 von 36

  9. Agenda • Initial Situation • Goal Setting • Trials • FireExtinguishingConceptTrafoProtect 9 von 36

  10. T1 und T3 F3 T4 T2 T1 und 3 T2 F2 F1 T1 und T3 T4 • Experimental assembly in thefiretunnelat DMT, Dortmund • 3) Trials • Lateral view • Topview Size ofthe „Mock-up“: 2,8 x 2,2 x 2,5 m (W x D x H) Wind direction

  11. 3) Trials • Experimental assembly in thefiretunnelat DMT, Dortmund

  12. Firetestsandresults (genericexample) • 3) Trials • Trial goal: Firesuppression • Puddle, Stream and spray fireunder different conditions • Nozzlesinstalled on onesideonly in thetrial; safetyfactor • Nozzlepressureandwaterquantitywerelower in thetrialsthan in thespecific design rule

  13. 3) Trials • Impressionsofthefiretests

  14. Agenda • Initial Situation • Goal Setting • Trials • FireExtinguishingConceptTrafoProtect 9 von 36

  15. The Minimax ProtectionConcept • 4) FireExtinguishingConceptTrafoProtect • Transformer isregardedas „lost“ in caseoffire • Firesuppression/ Firecontrol; noextinguishingnecessary • No „special“ components; e.g. high-pressurewaterfog = stainlesssteel, filter, „specialfittings“ • Certificateswithoutsizerestriction, testingunder „influenceof wind“ !!International: UL VerificationDeutschland: DMT Eignungsbestätigung • Waterapplicationwithsafetyfactorislowerthanaccordingtotheguideline

  16. 4) FireExtinguishingConceptTrafoProtect • ApprovalandCertification • Components are allUL listed • Trial resultsacceptedbyUL and DMT • Specificplanningandinstallationinstructionschecked an acceptedby UL und DMT

  17. Thankyouforyourattention! Andreas TeckenburgDivision Energy