1 / 14

Progress Report of World-wide Light-duty Test Cycle and Mode Construction

Progress Report of World-wide Light-duty Test Cycle and Mode Construction. Prepared by WLTP-DHC/MCTF under GRPE/WLTP informal group. 65 th GRPE 17 th /18 th Jan. 2013 Palais des Nations, Geneva. Table of contents. Progress since 64 th GRPE meeting Finalized Cycle Profile

amish
Download Presentation

Progress Report of World-wide Light-duty Test Cycle and Mode Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report of World-wide Light-duty Test Cycle and Mode Construction Prepared by WLTP-DHC/MCTF under GRPE/WLTP informal group 65th GRPE 17th/18th Jan. 2013 Palais des Nations, Geneva

  2. Table of contents Progress since 64th GRPE meeting Finalized Cycle Profile Cycle Allocation Gear Shift Prescription Open Issues Lists Status of Mode construction Technical Report Next actions 2

  3. 1. Progress since 64th GRPE ’12/5 6 7 8 9 10 11 12 ’13/1 13th DHC 14th DHC 15th DHC • Agreed to apply Ver5.1 (Vmax.≦120km/h) • Agreed cycle allocation • Proposed cycle profile modification(ver5.3) for Class 3 by India Proposed cycle profile modification(ver5.1) for Class 3 by Japan • Provisionally agreed to apply Ver5.1 (Vmax.≦120km/h) • Decided to set mode construction task force for detailed discussion Cycle Validation 2 Test Adopt HS3 logic during Validation2 • Confirmed well work • No major concern • Continue improvement Gear shift Work under DHC Work under MCTF Mode Construction • List up discussion points • Set proposals on several points • Still remain discussion points Technical Report Complete by 66th GRPE (JRC, Mr. Steven and JPN) • Developed outline of contents • 1st version 3

  4. 2. Finalized Cycle Profile During 16th DHC meeting, it was agreed to modify the cycle profile (Ver5.3 proposed by India) for Class3. DHC has successfully developed the harmonized test cycles. Specific time table of each cycle profile can be seen in WLTP-DHC-16-06 (UN web site) Ex-HIGH for Class2 HIGH MIDDLE LOW for Class3 HIGH MIDDLE for Class1 MIDDLE LOW LOW Ex-HIGH

  5. 3-1. Cycle Allocation L + M + H + ExH *1/*2 L + M + H Class 3 (= Ver5 or Ver5.3) (= Ver 5.1) 34 Power Mass* Ratio (kW/t) Class 2 L + M+ L L + M+ H L + M+ H+ ExH *1 22 L + L+ L L + M+ L Class 1 70 90 120 135 Mass* = Kerb Mass Vehicle Max Speed (km/h) During 15th DHC meeting (Dec 2012), the following cycle allocation was agreed. Threshold for electrified vehicles is under the discussion among DTP-Elab subgroup. *1) exempted as per CPs need *2) capped speed according to vehicle maximum speed 5

  6. 3-2. Alternative Cycle Allocations During 16th DHC meeting, the following cycle allocations were proposed by Germany for alternative to avoid special design for cycle allocation (refer WLTP-DHC-16-04). note) Ex-H phase can be exempted as per CPs need 6

  7. 3-3. Threshold speed of Cycle Allocations During 16th DHC meeting, India has proposed to set margin for capped cycle speed by 15% (refer WLTP-DHC-16-05). On the other hands, EU and Korea have expressed their concerns stating that margin should be minimized as much as possible. [ Request to all CPs ] Each CP is requested to provide their written comments regarding both alternative cycle allocation and threshold speed by no later than 1st Feb. 2013 to DHC chairman and secretary. ishii@ntsel.go.jp, nick@ichikawa.tec.toyota.co.jp 7

  8. 4. Gear Shift Prescription (Steven3) Mr. Steven has presented latest status of gear shift prescription (refer WLTP-DHC-16-03). • Validation 2 test indicated that this gear shift logic works well and no major concern was observed. Based on comments provided from participant laboratories, continue to work for improvement, then provide final version before starting confirmation testing. 8

  9. 5.1.Open Issues -1 CLOSED CLOSED under the discussion CLOSED under the discussion 9 9

  10. 5.2. Open Issues -2 under the discussion under the development under the discussion CLOSED 10 10

  11. 6.1. Mode Construction -1 Summary of discussion points 11 11

  12. 6.2. Mode Construction -2 Summary of discussion points 12 12

  13. 7. Technical Report Contents of Technical Report are described in right side(). JRC, Mr. Steven and Japan work together and will provide the 1st version during next GRPE (June 2013). 13 13

  14. 8. Next Actions 21 17th DHC 21&22 in Tokyo 18th DHC 66th GRPE Web Ad-hoc GRPE 16th DHC 65th GRPE Provide written comments Final refine Finalize gear shift Develop Technical Report Finalize formal documents Close open issues for testing Close all open issues Preparations 12 DTP 13th DTP 14th DTP 14 14