1 / 18

Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR Tim Roberts, City of Colorado Springs. Integrating Assessment of the Economic Benefits of Transportation Improvements in Project-Level Alternatives Analysis. 1. Fillmore Street: Interstate 25 to Centennial Blvd.

angelo
Download Presentation

Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR Tim Roberts, City of Colorado Springs Integrating Assessment of the Economic Benefits of Transportation Improvements in Project-Level Alternatives Analysis

  2. 1. Fillmore Street: Interstate 25 to Centennial Blvd Project overview 2. Fillmore/Chestnut/Interstate 25 Intersection

  3. Fillmore Street experiences significant congestion and queuing during peak periods Morning and evening peak hour queuing extends far up the “Hill” Traffic flows will increase in the future

  4. Pavement condition and inadequate shoulders are unsafe for pedestrians and bicyclists Steep grades, narrow shoulders and … rough pavement surface and lack of sidewalk is daunting to pedestrians and bicyclists

  5. Today’s Signals I-25 EA Approved Interchange Concept Single Point Urban Interchange (SPUI)

  6. What Are the Project Benefits? • Improves Traffic Operations • Helps boost economic development opportunities along the corridor • Constructs missing infrastructure • Enhances transit operations and facilities • Minor reduction in Vehicle Miles Traveled

  7. alternatives

  8. Alternative 3

  9. Benefit Estimate • Congestion reduction: vehicle hour traveled(VHT) savings • Comparison between no-action and alternative scenario • Regional VHT difference • Traffic operational improvement • Conversion to dollar benefits • Categorize VHT savings by truck/car, on-clock/other trip • Input to TREDIS (Transportation Economic Development Impact Software)

  10. Benefit Cost Analysis • Project benefits • Travel time savings for road users • Vehicle operation cost savings for road users • Environment benefits for public (air quality) • Reduced travel time variability • Project cost • Design • Right-of-way acquisition • Construction costs • Maintenance costs

  11. Benefit Cost Analysis • Travel time saving for road users • Value of time by trip purpose • Vehicle occupancy • Car and Truck variables • Accident cost savings (not included) • Reduce potential for accidents • Reduce cost to users

  12. BCA Results Analysis Period: 2015-2035

  13. Proposed Action • Easily be integrated with CDOT’s Preferred Alternative • Signalized intersection with the realigned Chestnut Street requires raising of Fillmore Street • Coordinate with CDOT to acquire necessary Right-of-Way (2 Gas Stations) • Feedback from Parker Street residents has been in support of the cul-de-sac • Minimum of 3 Parker Street homes as part of acquisition

  14. Conclusion • Public/social investment • TDM and traffic operation analysis • Delay savings benefit • The results consistent with expectations • Technical information is one measure

  15. Questions & Discussion Thank you

More Related