An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONSTRUCTION MANAGERS MANUAL Nabil Fahoum February 2013

  2. Construction Manager’s Manual

  3. 1000 Administrative 3000 Procurement 4000 Engineering 5000 Construction 6000 Quality Assurance 7000 Program Controls Program Management Procedures

  4. Revised Form A-26 Bridge Rehabilitation Report 4

  5. Quality Assurance (QA)Quality Control (QC) • The Contractor is responsible for the quality control of their Work. • The CM verifies compliance with QA/QC requirements to ensure that all components of the Contractor’s work conform to the plans, specifications, applicable standards and other requirements of the contract. 5

  6. Daily Activity Report, Daily Report & Field Book Daily Activity Report Form A-1B Daily Report Form A-1 Field Book 6

  7. Punch List A list prepared by the CM of outstanding work items and/or work items not complete in conformance with the contract. Form A-45 PL Punch List Template. 7

  8. Project Walkthroughs Pre-Final Walkthrough • Walkthrough attendees: • CM • Tollway Maintenance • Tollway PM • Tollway GEC • Tollway User Departments • Contractor (Optional) • General Project Overview • Prior to Substantial Completion • Punch List Available to Attendees • Contract vs. Extra Work Items 8

  9. Project Walkthroughs Final Walkthrough Completed Punch List 9

  10. Final Punch List Punch List Items Which Are Closed Documentation Provided To Indicate Why No Further Action Was Required By Contractor Physically Completed Form A-45 PL Punch List Template. 10

  11. Warranties 11

  12. Tollway Website Documents Reference Documentation http://www.illinoistollway.com/doing-business/construction-engineering

  13. Documentation Matrix For Construction

  14. Questions ? E-Mail: nfahoum@getipass.com 14