CONSTRUCTION MANAGERS MANUAL Nabil Fahoum February 2013
1000 Administrative 3000 Procurement 4000 Engineering 5000 Construction 6000 Quality Assurance 7000 Program Controls Program Management Procedures
Quality Assurance (QA)Quality Control (QC) • The Contractor is responsible for the quality control of their Work. • The CM verifies compliance with QA/QC requirements to ensure that all components of the Contractor’s work conform to the plans, specifications, applicable standards and other requirements of the contract. 5
Daily Activity Report, Daily Report & Field Book Daily Activity Report Form A-1B Daily Report Form A-1 Field Book 6
Punch List A list prepared by the CM of outstanding work items and/or work items not complete in conformance with the contract. Form A-45 PL Punch List Template. 7
Project Walkthroughs Pre-Final Walkthrough • Walkthrough attendees: • CM • Tollway Maintenance • Tollway PM • Tollway GEC • Tollway User Departments • Contractor (Optional) • General Project Overview • Prior to Substantial Completion • Punch List Available to Attendees • Contract vs. Extra Work Items 8
Project Walkthroughs Final Walkthrough Completed Punch List 9
Final Punch List Punch List Items Which Are Closed Documentation Provided To Indicate Why No Further Action Was Required By Contractor Physically Completed Form A-45 PL Punch List Template. 10
Warranties 11