1 / 7

TEFMA Workshop - The University of Waikato

TEFMA Workshop - The University of Waikato. Energy Performance Partnerships. TEFMA Workshop - The University of Waikato Energy Performance Partnerships. Honeywell and Energy Performance Contracting Introduction to EPC - 10 years in A/NZ EPC is about the responsible use of energy

archer
Download Presentation

TEFMA Workshop - The University of Waikato

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEFMA Workshop - The University of Waikato Energy Performance Partnerships

  2. TEFMA Workshop - The University of Waikato Energy Performance Partnerships • Honeywell and Energy Performance Contracting • Introduction to EPC - 10 years in A/NZ • EPC is about the responsible use of energy • Core Competency - among a range of products and solutions • Market segments: • Healthcare • Education • Commercial • Industrial • Hospitality

  3. TEFMA Workshop - The University of Waikato Energy Performance Partnerships • The Relationship at Waikato • Extendedsite presence • Substantial Building Management System • Install business - no formal agreement • In House maintenance

  4. TEFMA Workshop - The University of Waikato Energy Performance Partnerships • Key Fundamentals of an Energy Performance Contract • The Partnership • The Performance Guarantee • Energy Cost Savings to fund upgrades

  5. TEFMA Workshop - The University of Waikato Energy Performance Partnerships • The EPC Process • Preliminary Audit - no cost - establish potential • Presentation of Preliminary Audit/opportunity • Letter of Intent • Engineering Solution - Scope of Work • Final Proposal - negotiations • Installation • M&V Process - long term • Maintenance - long term

  6. TEFMA Workshop - The University of Waikato Energy Performance Partnerships • Areas of Potential Savings Identified: • BMS Control of Direct Electric Heating • Better Control of VAV Electric Re-Heating • Load Shedding of Electric Loads • 100% re-cycled air during pre-occupancy warm-up • Validate operation of economy cycles where fitted • Extend the use of cabon dioxide(C02) Sensing • Pre-cooling with outside air when conditions permit • Eliminate unnecessary cooling and subsequent reheating • Extend BMS to buildings with no BMS • Optomised starting and stopping of plant • Revisit lighting control

  7. TEFMA Workshop - The University of Waikato Energy Performance Partnerships • Finance • Options - ECCA - Dan Coffey • Thank You

More Related