1 / 16

LiveDiverse meeting in India 16 - 22 January 2011

Sustainable Livelihoods and Biodiversity in Developing Countries WP-5. Construction, management andn facilitation of the GIS database. LiveDiverse meeting in India 16 - 22 January 2011. WP-5’s Update from Mar –Dec 2010). Manual on Data requirement and Analysis. List of 50 indicators.

arlen
Download Presentation

LiveDiverse meeting in India 16 - 22 January 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sustainable Livelihoods and Biodiversity in Developing CountriesWP-5. Construction, management andn facilitation of the GIS database LiveDiverse meeting in India 16 - 22 January 2011

  2. WP-5’s Update from Mar –Dec 2010)

  3. Manual on Data requirement and Analysis • List of 50 indicators. • General GIS data requirements. • Descriptions, data requirement and analysis method for each of 50 EVI indicator. Download: http://www.livediverse.com/2009/10/reports.html Select: Manual for EVI's Data Requirement and Analysis (Apr. 2010).

  4. EVI Technical Report • Concept and definition. • EVI and LiveDiverse research work. • EVI indicators – mapping vulnerability. • EVI calculation. • Database establishment. Download: http://www.livediverse.com/2009/10/reports.html Select: Methodology on Environmental Vulnerability Assessment - WP-5 technical report. June 2010. Download.

  5. M5.1 Report • Classification of EVIs. • EVI’s strength and weakness. • Criteria for selection. • Method for calculation. • Status of the LiveDiverse database. • Preliminary results. Download: http://www.livediverse.com/2009/10/reports.html Select: Refinement of the set of 50 indicators. August 2010. Download.

  6. Babe – Nahang survey: June 2010 Babe lake (Babe) Nahang (Tuyen Quang)

  7. LiveDiverse stakeholders meeting “Biodiversity and Related Issues in the Complex of Ba Be – Na Hang”. Ha Noi 9th September 2010, NIAPP.

  8. Publication and communication Nguyen Van Toan, 8/2010. LiveDiverse on the go. Vietnam Environment Administration Magazine. Ministry of Natural Resources and Environment (Vietnamese). Nguyen Van Toan, 7/2010. Sustainable livelihoods and biodiversity in developing countries. Scientific Operation Magazine. Ministry of Science and Technology. ISSN 0866-7152 (English, Vietnamese). Stakeholder meetings. LiveDiverse website updates.

  9. Data collection and GIS works Refinement and error corrections of the GIS database. Data collection: GIS layers and data for EVI calculation.

  10. Online database development (1/2)

  11. Online database development (2/2) • Internet site: http://www.livediverse.tk • Local site: http://livediverse:8000 • Demo video

  12. Other works in collaboration • Household survey questionnaire (WP-6 and WP-7) – April - May. • Scenario development (Alexander, Vietnam 5-10 July 2010). • Babe – Nahang fieldtrip (Farhad), October 2010. • Project implementation report and partners’ meettings (Geff.), Vietnam 18-24 October 2010. • Database updates with SA, Costa Rica and India (by email), Mar - December 2010.

  13. Issues • EVI data collection • Lack of time-series data. • Lack of data for some EVIs. • Data purchase.

  14. 2011 Plan (1/2) • Database completion. • Reports. • Communication. • Proposal: a practical model for sustainable livelihood development.

  15. 2011 Plan (2/2) Paper publication:

  16. Thank you !

More Related