320 likes | 490 Views
FOLDING TOW BAR PROJECT. INCREASING PRODUCTIVITY AND EFFICIENTY OF MULE OPERATION. MARGARET L. SELLERS P&DC. PRESENTATION BY: QUALITY CIRCLE: COMBINED MINDS. A QWL PROJECT. PROPOSAL. QUALITY CIRCLE: COMBINED MINDS Art Aficial – Member Martin Garland – Member James Kuder – Charter
E N D
FOLDING TOW BAR PROJECT INCREASING PRODUCTIVITY AND EFFICIENTY OF MULE OPERATION MARGARET L. SELLERS P&DC PRESENTATION BY: QUALITY CIRCLE: COMBINED MINDS A QWL PROJECT
PROPOSAL • QUALITY CIRCLE: COMBINED MINDS • Art Aficial – Member • Martin Garland – Member • James Kuder – Charter • Shala Marolda – Time Keeper • Melissa Mata – Minute Taker/Recorder • Elva Verduzco – Moderator/Facilitator • Evelyn Yu – Member • Jun Calalay – Supervisor • Marc Alain Amio – QWL Coordinator FOLDING TOW BAR PROPOSAL
PROBLEM Define Problem DEFINE THE PROBLEM CONCERNS FROM OLD TOW BAR Define • The old tow bars are poorly constructed. • Easily Breaks • Unsafe • Non Ergonomic • High Welding Cost Overall • Poor Performance FOLDING TOW BAR PROPOSAL
TOW BAR DESIGN EXPLAINING THE POOR CONSTRUCTION Poorly constructed tow bar impacts the productivity of mule operation. The universal tow bar does not adapt to current operational needs. FOLDING TOW BAR PROPOSAL
PRACTICE • POOR PRACTICE The stacking method of old tow bar is time consuming. FOLDING TOW BAR PROPOSAL
MEASUREMENT Define Measure DEFINE THE PROBLEM GATHER DATA In this phase, the Quality Circle members gather the needed data for further assessment and comparison of the old tow bar with the new tow bar. FOLDING TOW BAR PROPOSAL
DATA Define DEFINE THE PROBLEM GATHER DATA FOLDING TOW BAR PROPOSAL
COMPARISON Define DEFINE THE PROBLEM STUDY DATA Comparison: FOLDING TOW BAR PROPOSAL
COMPARISON Define DEFINE THE PROBLEM STUDY DATA Comparison: FOLDING TOW BAR PROPOSAL
COMPARISON Define DEFINE THE PROBLEM STUDY DATA Comparison: FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM ACCOUNTING Define STUDY DATA The number of old tow bars that needs repair. FOLDING TOW BAR PROPOSAL
ASSESSMENT Define Assess DEFINE THE PROBLEM STUDY DATA In the Assessment Phase, the Circle Members will review the data. The objective of this phase is to identify potential root cause of the problem, and then confirm actual root causes with supporting data. FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM ACCOUNTING Define STUDY DATA The number of old tow bars that needs monthly repair. FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM COST Define STUDY DATA The worth of wage paid to welder: FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM COST Define STUDY DATA The worth of wage paid to welder: FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM COST Define STUDY DATA The number of new tow bars: FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM SAVINGS Define TOTAL ANNUAL SAVINGS The number of old tow bars that needs repair: FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define Improve DEFINE THE PROBLEM IMPLEMENT PROPOSAL The main objective of this phase is to develop, select, and implement the best solution. FOLDING TOW BAR PROPOSAL
STACKING Define DEFINE THE PROBLEM IMPLEMENT PROPOSAL FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define DEFINE THE PROBLEM IMPLEMENT PROPOSAL Pulling APC FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define DEFINE THE PROBLEM IMPLEMENT PROPOSAL Pulling Hampers FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define DEFINE THE PROBLEM IMPLEMENT PROPOSAL Pulling Wheelers FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define DEFINE THE PROBLEM IMPLEMENT PROPOSAL Pulling OTRs FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define DEFINE THE PROBLEM IMPLEMENT PROPOSAL Pulling Wire Containers FOLDING TOW BAR PROPOSAL
IMPROVEMENT Define DEFINE THE PROBLEM STACKING FOLDING TOW BARS FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM IMPROVEMENT Define VIDEO PRESENTATION FOLDING TOW BAR PROPOSAL
PROJECT PLAN Define Proposal DEFINE THE PROBLEM MAINTAIN SUCCESS The main objective of this phase is to ensure that the new tow bars will guarantee an increased productivity. Control phase will maintain the changes and ensure that the process is carried out consistently. FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM MAINTENANCE Define STANDARD OPERATING PROCEDURE The new folding tow bars will be labeled according to the assigned mule number. The On-the-Job Instructor (OJI) will provide new training for the proper use of the new folding tow bar. This will help mule operators learn how to make necessary driving adjustments to adapt with the use of the new folding tow bar. Periodic survey assessment will be conducted to address the concerns of mule operators for possible modifications. FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM SOP Define STANDARD OPERATING PROCEDURE The folding tow bars will be monitored. Any folding tow bar that requires repair work will be recorded for future reference. Additional refresher training may be needed for mule operators with more than one accidents or tow bar repair work requests. A container located by the new MVS office will be used for damaged universal and folding tow bars. Replacements are available upon request to the OJI or designee. FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM APPROVAL Define PROJECT CONTACTS: DWIGHT WHITNEY (OJI) LEO YUBANE (QWL CIRCLE MEMBER) ELVA VERDUZCO (QWL PROCESS FACILITATOR) MARC ALAIN AMIO (QWL COORINDATOR) FOLDING TOW BAR PROPOSAL
DEFINE THE PROBLEM IMPLEMENTATION Define DURABILITY SAFETY EFFICIENCY PRODUCTIVITY FOLDING TOW BAR PROPOSAL
THANK YOU FOR COMING! WWW.QWLSANDIEGO.INFO FOLDING TOW BAR PROPOSAL