An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DDR Phase 2 Status EPIM RUF meeting June 16th 2009

  2. DDR XSD PCA RDS NPD/PSA Fact database Daily Drilling reports XML Daily Drilling reports XML Daily Drilling reports XML pdf pdf pdf DDR to regulators and license partners- Scope and deliverables of DDR phase 2 Operators Regulators PSA/NPD app Drilling App/DB Drilling data License Partners LicenseWeb Drilling App/DB Schema/Business validation

  3. Status • As of March 24th EPIM officially owns the DDR XML schema • Partner reporting in License web • Same information content as submitted to PSA Status: • Specification document completed • Build - in progress • Updates to XML schema – documented in separate document • WITSML 1.4.0 compliance • Correction of misspelling of enumerated values • Correct use of wrong data types (For example on comments which are limited to 256 characters) • Some elements may be changed from ‘optional’ to ‘mandatory’ in the report. • SAWSDL annotation • Coordination with Energistics Status: • Tested and completed – ready for approval by project group

  4. Status • Standard report layout for PDF reports Status: • Completed – approved by project group in meeting February 9th 2009 • User guide updates - PSA Status: • Draft version available at(http://www.ptil.no/getfile.php/PDF/DDRS%20-%20borerapportering/WITSML_drillReport_profiled_schema_for_usermanual.xml) • Schema validation error messages - PSA Status: • Business rule validation error messages will be updated by cut of to new formats

  5. Way forward • Completion of DDR partner reporting in LW – Responsible Tieto, follow up by LW User forum • Communication to EPIM members regarding new DDR formats and date for go live of DDR reporting in Licenseweb – responsible EPIM Report User Forum – Drilling • Communicate to operators regarding cut of date for new formats to PSA – Responsible PSA • Project documentation will be added to EPIM’s document repository • October 1st is the date when PSA will require DDR according to the new formats, and the new DDR partner reporting solution in Licenseweb will be ready for use! • Further improvements and extensions of the DDR XML schema will be handled by EPIM RUF – Drilling • A possible first case can be increased information scope in DDR. See Next slide

  6. Additional information requirements – NB not included project scope Identified during DDR Phase 1 • Operation codes • Cement • Period of operation • “Drilling like units of measure” • Formation name – selection list • Datum (reference points) • Casing type • Pressurized coring • Well stimulation (At well testing) indicator • Perforation - Shot density • RIGTYPE • Bit data • Side track • Tight wells Identified during DDR Phase 2 • Cost • Report nr -> A sequence number. Each day of operation is a new number increment • Start date -> Start of reporting/operation • Water depth • Bit record (additional info): grading, depth in, depth out, drill lenght (m), duration (hr), rop (m/hr) • Casing (new section): OD (in),top, bottom, weight, grade, estimated top of cement • "Duration" should be included for all time intervals.

  7. Safeguarding life, property and the environment www.dnv.com