TRD Status Report. AMS TIM CERN, 24-Apr-2006. Octagon Integration T. Siedenburg 20min DAQ Electronics F. Hauler 10min Gas System & Electronics B. Borgia 20min. Aachen TRD Status Report. Th. Siedenburg AMS TIM CERN, 24-Apr-2006. TRD Octagon Integration (Th.Kirn). 21-APR-2006.
E N D
TRD Status Report AMS TIM CERN, 24-Apr-2006 Octagon Integration T. Siedenburg 20min DAQ Electronics F. Hauler 10min Gas System & Electronics B. Borgia 20min
Aachen TRD Status Report Th. Siedenburg AMS TIM CERN, 24-Apr-2006
TRD Octagon Integration (Th.Kirn) 21-APR-2006 I. Özen
TRD Octagon Integration 21-APR-2006
TRD Octagon Integration • All DALLAS temperature sensors tested • All 82 flight frontend boards installed (UFE) • HV ground connections installed • UFE function tests in progress • Gas-tower interconnection tubes installedTower to tower finished next week • Gas-group cosmic tests in preparation • TRD upper plate: Installation of inserts • STA M-Structure machined within specs.Test mounting in preparation • TRD Rosengitter in preparationGastubing / Dallas & UFE cabeling
TRD Longterm Test 2 Years Gastightnessunchanged Gasgainstable J. Hattenbach
Final Report on TRD Front End ElectronicsUFE (Flight Modules)Ch.H. Chung
Production of UFE (FM) Integration + 358VA Chips Tests Select 202 Chips 101Production of 4 Types PCB Series of Space Qualification Tests Functional Tests TVT 3D Vibration Coating TVT
Space Qualification Tests Random Vibration X,Y and Z-Direction aRMS = 6.8g, 20-2000 Hz for 120 sec Functional test without failure 1st TVT Temperature : -40oC … +80oC Pressure : 110-5 mbar Functional test without failure 2nd TVT Same as 1st TVT condition Conformal Coating
Thermal Profile in TVT Operating Temperature (-20 ~ +50 oC) : Gain Calibration Points
Noise after SQT Noise = 1.5 ADC == ENC = 4000 e- Common mode noise corrected Pedestal RMS
Gain Calibration +50 oC -20 oC
Gain vs. Temperature All 6464 channels are calibrated over full Temperature range
Flight UFE Selection ALL 101 produced UFEs within specificationsSelect “better“ UFEs as flight modules
TRD-UFE (FM) Pedestal Distribution : ~ 10% of full range
TRD-UFE (FM) Noise RMS Spread : ~ 4%
TRD-UFE (FM) Gain RMS Spread : ~ 3% 25oC
TRD UFE Summary UFE(FM) Production : Finished (Jul. 2005) Total = 101 UFEs (FM = 82, FS = 19) Functional Tests : Finished (20.07.05) UFE Space Qualification Tests (Mar.05 ~ Mar. 06) 1st Thermal Vacuum Test = 101 (Done w/o failure) Random Vibration Test = 101 (Done w/o failure) Conformal Coating = 101 (Done w/o failure) 2nd Thermal Vacuum Test = 101 (Done w/o failure) Best 82 FMselected (Mar. 2006) UFE Integration : Finished (Apr. 2006)
TRD Gas Manifolds • Distribute TRD gasflow into 41 segments • Measure gastightness of individual segments • Allow isolation of a segment when leaky • Introduce no additional risk of gas leakage
OctagonTemperature Swing +30 R,P,Y hottest OHB TRD Thermal Report 240 days (4 b periods) eMLI = 0.03 Average TRD Temperaturebetween +35oC and -20oC Depending on ISS R, P, Y 0 R,P,Y coldest -20
Improve Manifold Leaktightness FVb FVa
● Dry mounting of all components● Full function test● Potting when ok New Manifold Prototype Alu. Body Viton Seal Alu. Cover
New Manifold Design Fits inside existing magnetic shielding Gas connectionswith double-o-ringfront access
Cold Case Flipper-Valve Operation Leakage to outside if switched below -8oC No switching below -15oC Buerkert 6124 Flipper-Valve Temperature TVT Tank Vacuum Viton Bag
FVa FVa+b FVb 18×10-5 3.4×10-5 l mbar/s 3.0×10-5 Helium Leakrate (1 Gasgroup 50×10-5 ) Manifold operation: heated switching Switching in TVT at -25oC ok if valve heated to 0oC Heating of fully potted 2FV manifold: 2 x 2W x 30 min. Gastightness through valves and to outside ok Heater powerline control (8H+8C 40W each) TBD SMD 100W
TRD Integration Schedule Octagon Integration finished in May 06Rosengitter tubing & cabeling Jun - Sep 06Manifold design & production Apr - Oct 06Box-S/C EM -> QM upgrade Apr - Jul 06UG QM Electronics Prod. & Test Apr - Oct 06Box-S/C FM Prod. & Test Apr - Dec 06TRD Cosmics EM UGcrate @ RWTH Nov - Dec 06TRD Cosmics QM UGcrate TBD Jan - Mar 07UG FM Electronics Prod. & Test Oct 06 - May 07