1 / 15

Conseil Scientifique du LPNHE LSST au LPNHE

Conseil Scientifique du LPNHE LSST au LPNHE. - 2 transparents de la biennale 2005 - SNLS/SNF «timeline » - LSST - LSST au LPNHE. 2005: une nouvelle donne. SNAP : - conçu en 1999 dans la foulée des résultats de 98 (SCP) : - Faire vite (SNAP) : 2006

Download Presentation

Conseil Scientifique du LPNHE LSST au LPNHE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conseil Scientifique du LPNHE LSST au LPNHE

  2. - 2 transparents de la biennale 2005- SNLS/SNF «timeline »- LSST - LSST au LPNHE

  3. 2005: une nouvelle donne SNAP : - conçu en 1999 dans la foulée des résultats de 98 (SCP) : - Faire vite (SNAP) : 2006 - Statistique x 20 + SNfactory - Contrôle des systématiques via spectro au max (« pari ») Aujourd’hui (2005) : - Retard probable o(10 ans) - Spectro (au max) peine à confirmer son utilité pour les syst. - SNLS : o(1000) SNe, imagerie multi-couleur très prometteuse pour l’identification des SNe et le contrôle des systématiques • « Revisiter » le cas scientifique pour une manip SN spatiale (ex DUNE) • Profiter de ce répit pour tirer toute la substance des manips de 2nd génération (sol)

  4. Conclusion (de la biennale 05) Bilan: Position très forte des équipes l’IN2P3 (et du LPNHE en particulier) dans les 2 principaux projets sol actuels (SNF, SNLS). Etude de risques: SNLS : météo, « publish or perish » SNF : Opération du SNIFS : seulement 4 permanents (au total) : besoin de renfort immédiat (1 CR profil « analyse proche instrument ») Perspectives: Spatiales : 2015-2025 + incertitudes programmatiques (AO NASA et/ou ESA CosmicVision). Equipe du LPNHE très bien placée pour software/analyses. Quelle contribution (hardware) pour les équipes IN2P3 ? Autres perspectives: 2009-2015+: place pour un projet (instrumental) centré sur SN proches (SNFII, SNLSP) ou très hautes lumi (>105) de SN distantes (Pan Starrs, LSST)

  5. SNLS/SNF timeline CFHTLS fin prévue: Juillet 2008 extension de 1 semestre demandée par CFHTLS/WIDE SNLS -> juillet 2008. Extension évoquée par collaborateurs C. SNLS au LPNHE : -> Données jusqu’en Juillet 08 -> en 2007 DICE sur CFHT -> 01/2009+ SNfactory extension approuvée/demandée par UH en 2007+2008 approuvée pour 2007 par LBNL SNfactory au LPNHE -> données jusqu’à fin 2008 -> maintenance SNIFS

  6. Design Telescope and Camera as a Single Instrument LSSTConcept • 8.4 Meter Primary Aperture • 3.4 M Secondary • 5.0 M Tertiary • 3.5 degree Field Of View • 3.2 Gigapixel Camera • 4k x 4k CCD Baseline • ~200 detectors • 65 cm Diameter • Six Filters • 30 Second Cadence • Highly Dynamic Structure • Highly Parallel Readout • Accumulated depth ~27 mag. in each filter over 10y • Data Storage and Pipelines ~ 18Tb/night! • Etendue = 270

  7. Principle LSST Science Missions • Dark Energy / Matter • Weak lensing - PSF Shape/ Depth / Area • Super Novae + Photo z – Filters / • Map of Solar System Bodies • NEA – Cadence • KBO - • Optical Transients and Time Domain • GRB Afterglows – Image Differencing • Unknown transients - • Assembly of the Galaxy and Solar Neighborhood • Galactic Halo Structure and Streams from proper motions

  8. LSST probes of dark energy • WL shear-shear tomography • WL bi-spectrum tomography • Distribution of 250,000 shear peaks • Baryon acoustic oscillations • 2.5 million SNe Ia, z<0.8 • 60,000 SNe Ia, z<1.2 • Low l, 2p sky coverage • 3x109 galaxy sources • probe g(z) and d(Z) separately • multiply lensed AGNs and SNe

  9. Camera Development

  10. Focal plane array 3.5° FOV  64 cm dia Strawman CCD layout 4K x 4K, 10 µm pixels 32 output ports 201 CCDs total Raft = 9 CCDs + 1cm x 1cm reservedfor wavefront sensors

  11. CY 05 CY 06 CY 07 CY 08 CY 09 CY 10 CY 11 CY 12 CY 13 MREFC Award Project Baseline Schedule Plans NSF D & D Phase MREFC Construction Phase Comm&Science First Light Submit MREFC Mirror Fabrication/ Cell Assembly Telescope Site Preparation Mount/Dome System Integration Camera Design Camera fabrication & integration Camera Sensor Dev’l and protoype Sensor Fabrication Software Preliminary Design Software Final Design Data Mngt SoftwareValidation Software Integration

  12. Que demandons-nous ? votre soutien

  13. DICE Group Review Findings(Paris Nov 13, 2006 - K. Gilmore invited) • Photometric calibration is indeed a key issue of current and future wide field surveys • Quantify the scientific gain • Direct illumination with LEDs is a very appealing concept • Key features (stability and control, LED light emission properties, …) to be validated on test/calibration bench • Get results from «Dome illumination with a tunable laser » experiment at CTIO (C. Stubbs) • Cost estimate found ok - Technical team found strong • Problem with the leaving of C. Juramy in Jan 07 • Go forward: immediately - do test/calibration bench validation measurements - start discussing implementation with CFHT

More Related