AHMED IBRAHIM. Activity in 904. Reconstruction of RPC. In 904 we reconstructing the RPC. 1 st we make testes for gaps. Gas inlets broke. Visual test. Leak test. 5 mbar by U tube 15 mbar by PLW Recorder. Pressure. Time. Spacer test. Pressure. Pressure. time. time. Pressure. time.
E N D
AHMED IBRAHIM Activity in 904
Reconstruction of RPC In 904 we reconstructing the RPC 1st we make testes for gaps
Gas inlets broke Visual test
Leak test 5 mbar by U tube 15 mbar by PLW Recorder Pressure Time
Pressure Pressure time time Pressure time Spacer test data Pressure Pressure time time
Example of a bad spacers Pressure time
2nd building the chamber Top gaps Distribution boards Bottom gap
DOUBLE A Efficiency curve DOUBLE B
DOUBLE A Cluster size curve DOUBLE B