210 likes | 348 Views
ASHRAE Annual Conference Sustainability Project. Denver Rescue Mission Energy Efficiency Upgrades 1130 Park Avenue West, Denver, CO 80205. Learn More @ www.ASHRAEDenver2013.org. 2013. WHO. Our local ASHRAE chapter membership community. WHAT.
E N D
ASHRAE Annual Conference Sustainability Project Denver Rescue Mission Energy Efficiency Upgrades 1130 Park Avenue West, Denver, CO 80205 Learn More @ www.ASHRAEDenver2013.org 2013
WHO... Our local ASHRAE chapter membership community WHAT... In-depth energy assessment, technical design assistance, and the potential for high efficiency system installations WHY... Since 2008, each host city ASHRAE chapter has conducted a sustainability demonstration project of their choosing 2013
The Project • 3-story, 23,000 sq.ft. building built in 1928 • Tens of thousands of people come to this facility each year for shelter, food, and support
The Facility • Offices, two chapels, a library, a kitchen, a clinic, a dormitory and other ancillary spaces • 3 meals per day, dorms open each night
HVAC Systems • Large boilers and steam radiators with old valves • Constant volume make-up air unit (MAU) for dorms • Constant exhaust for showers • (4) split system AC units (offices, library, clinic) • (4) evap cooling units (dorm, chapel, dining room)
Utility Data • High EUI and Cost
Utility Data • Typical profile but high use
Project Goals: • Help the facility operate more sustainably with lower energy use and better Indoor Air Quality - Lower annual energy costs over 30%
Energy Efficiency Upgrades • Lighting Upgrade • Replacement of (4) Split Systems • Installation of DDC System • Steam System Upgrades • Replacement of MAU with ERV • Replacement of (2) DHW Heaters, Increased Capacity, Low Flow Shower Heads • Installation of Solar DHW System 2013
ECM: Lighting Upgrade • Currently 2 and 4-ft T-12 with magnetic ballasts • Older exterior lights • Limited occupancy sensors • Older Exit Signs • Project: Upgrade fixtures and add sensors
ECM: Replace Split Systems • Replacing (4) units - offices, library, clinic • New units are 21 SEER* @ ARI Conditions *SEER = cooling output during a typical cooling-season divided by the total electric energy input during the same period(BTU/W*hr)
ECM: Installation of DDC System • Tie together HVAC equipment, zone thermostats, on/off enable • Provide equipment scheduling, temperature control, unoccupied setback, and remote access
ECM: Steam System Upgrades • Thermostatic valves and steam traps in disrepair • Replace valves and steam traps • Address system leaks
ECM: Replacement of Make-Up Air Unit (MAU) with Energy Recovery Ventilator (ERV) • Tie restroom exhaust into ERV to capture heat • Continuous ventilation for better IAQ
ECM: Replacement of (2) DHW Heaters, Increased Capacity, Low Flow Showers • Currently only (2) 80 gal tanks • Adding more capacity and upgrading to 86% efficiency
Team and Fundraising 2013
Thank you Project Team! Technical Team: Owner Liaison and Program Support – Energy Outreach Colorado Project Management and Energy Support – Eaton Energy Solutions Mechanical and Plumbing Design – MKK Consulting Engineers, Inc Energy Audit – Investive Building Projects (formerly LONG Energy Solutions) Pricing and Contractor Liaison – US Engineering Solar Assessment – Shamrock Sales Energy Monitoring – ATS Steam System Assessment – Dick Scott Structural Assessment – Jirsa Hedrick & Associates General Contractor – C&D Management Lighting Assessment – Illumination Systems Fundraising: Fundraising Lead – Western Mechanical Solutions Finance and Sponsor Tracking – Mtech Publicity and Promotions: Promotions, Materials – Shaffer Baucom Website – John Eisel Promotions, Fundraising – IMS 2013
Thank you Sponsors & Donors! Platinum annexAir C & D Builders, Inc. Denver Office of Strategic Partnerships Mtech XCEL Energy Silver Apricus CAMUS HydronicsLtd. Cooper Lighting Johnson Controls Lohmiller & Company Carrier West McKinstry Patron Air Purification American Mechanical Services CFM Company Curb Technologies Davenport Family Gift Fund Hercules Industries Ideal Electric, Inc. Investive Building Projects RMH Group Slattery & Company TRANE Denver Winslow Crane Services Co. Gold Alerton ASHRAE Rocky Mountain Chapter ASHRAE Society ATS Rocky Mountain Ferguson Enterprises, Inc. McNevin Co. US Engineering Bronze Digital Communications Partner Denver Water M-E Engineers, Inc. MKK Consulting Engineers, Inc. Water Technology Group Western Mechanical Solutions Associate ASHRAE Black Hills Chapter James Waechter P.V.C. Specialties Company Shaffer • Baucom Engineering & Consulting Supporter Aaron Zimmerman Brian Lynch C&D Insulation, Inc. 2013
BE PART OF THE SOLUTION! LEARN MORE AND DONATE @ www.ASHRAEDenver2013.org General Project and Donation Inquiries: sustainable@rockymtnashrae.com 2013