1 / 26

GTEM CABLE EMISSION STUDIES MEASUREMENT TECHNOLOGY LIMITED JUNE 29 TH 2010

GTEM CABLE EMISSION STUDIES MEASUREMENT TECHNOLOGY LIMITED JUNE 29 TH 2010 Dr. Zaid Muhi-Eldeen Al-Daher Dr. Angela Nothofer Prof. Christos Christopoulos. GTEM User Group Meeting - MTL Luton. Presentation Outline. Repeatability Issues Correlation Algorithm EUT (Antenna Gain)

barto
Download Presentation

GTEM CABLE EMISSION STUDIES MEASUREMENT TECHNOLOGY LIMITED JUNE 29 TH 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTEM CABLE EMISSION STUDIES MEASUREMENT TECHNOLOGY LIMITED JUNE 29TH 2010 Dr. Zaid Muhi-Eldeen Al-Daher Dr. Angela Nothofer Prof. Christos Christopoulos

  2. GTEM User Group Meeting - MTL Luton Presentation Outline • Repeatability Issues • Correlation Algorithm • EUT (Antenna Gain) • Simulation & Measurements Results

  3. GTEM User Group Meeting - MTL Luton Repeatability Issues: Input Reflections – S11 • Return loss due to reflections at the cell’s input port • Losses include: mismatches and discontinuities, path losses, current and RF termination characteristics • Reflection losses should be better than -20dB • Peaks occur at every λ/2 away from the characteristic frequency Increasing reflections Termination cross over

  4. GTEM User Group Meeting - MTL Luton Repeatability Issues: Field Factor (Normalization) – GG Cell Up to 5dB errors

  5. GTEM User Group Meeting - MTL Luton Repeatability Issues: Field Factor (Normalization) – NPL Cell Up to 4.5dB errors

  6. GTEM User Group Meeting - MTL Luton Repeatability Issues: Field Factor (Normalization) – Both Cells • Difference in performance behaviour. • Different in induced field strengths – size factor. • Difference in e0y mean values (10dB in this example) must be normalised further.

  7. GTEM User Group Meeting - MTL Luton Repeatability Issues: Field Factor – Both Cells Common Normalization More ripples Common characteristic frequency

  8. GTEM User Group Meeting - MTL Luton • Repeatability Precautions • Cables, wires, bundles, devices under test must be all positioned within the testing volume of the GTEM cell. • The primary y-component of the electrical must be measured rather than calculated. • Data must be normalised to a common value of e0y. • Normalisation with respect to the input power if possible.

  9. GTEM User Group Meeting - MTL Luton Bundles

  10. GTEM User Group Meeting - MTL Luton Repeatability Measurements (Different wire lengths) Coil In-Line Twisted Inverse Twisted

  11. GTEM User Group Meeting - MTL Luton Correlation Algorithm Total radiated power algorithm is based on a multi-dipole model positioned over a perfect conducting ground plane. Assumptions: 1- Any EUT may be represented by a set-up of three orthogonal dipoles 2- Dipoles are electrically short w.r.t wavelength. E.g. at 1GHz max dimension must not exceed 30cm 3- Designed for frequency range of 300 to 1000MHz. 4 - Any radiation elements must not have a gain greater than a dipole 5- The maximum power can be depicted from any direction

  12. GTEM User Group Meeting - MTL Luton • Gains Using Antenna Theory • By treating wires and bundles as potential radiating elements, studying their gains across the frequency range becomes vital. • Strong directivities and high gains will invalidate the GTEM correlation algorithm. • Measuring gains and antenna patterns in a GTEM cell is different to that of an anechoic chamber since there isn't really a transmitting antenna. • By measuring the received power relative to that applied at the apex, and by accounting for any path and power losses, the gain produced by the EUT along with its cables can be determined as follows:

  13. GTEM User Group Meeting - MTL Luton Gains Using Antenna Thoery A factor that compensates towards the different field strengths inside the GTEM cell.

  14. GTEM User Group Meeting - MTL Luton Gains – CST Simulations – Max values in 3D

  15. GTEM User Group Meeting - MTL Luton Gains – CST Simulations – Radiation Patterns

  16. GTEM User Group Meeting - MTL Luton Gains – CST Simulations – Radiation Patterns

  17. GTEM User Group Meeting - MTL Luton Gains – CST Simulations – Radiation Patterns

  18. GTEM User Group Meeting - MTL Luton Gains – CST Simulations – Radiation Patterns

  19. GTEM User Group Meeting - MTL Luton Gains – Measurements Signal Generator Spectrum Analyser

  20. GTEM User Group Meeting - MTL Luton Gains – Measurements – Single Direction

  21. GTEM User Group Meeting - MTL Luton • Cable/Wire Bundles & The Correlation Algorithm – Problems • The problem of consistency in cable positioning and bundling while using the three-position correlation algorithm for emission testing in GTEM cells seems to be unavoidable in achieving sustainable repeatable results for the following reasons: • Cables cannot be simply held in one position without being rotated around the EUT’s axis. • By rotating the cables around the EUT main axis, the shape and length of cables will change. Accordingly, the emission levels observed could incorrectly differ considerably at different orthogonal positions. • In order to minimize repeatability errors cable movements must kept to a minimum.

  22. GTEM User Group Meeting - MTL Luton • Cable/Wire Bundles & The Correlation Algorithm – Problems • By averaging the received powers of the three orthogonal positions, emission levels could be well underestimated. • Equipments with cables fail to meet the assumptions of the three-position correlation algorithm particularly at frequencies above 0.8GHz.

  23. GTEM User Group Meeting - MTL Luton • Cable/Wire Bundles & The Correlation Algorithm – Solution • Going with the viewpoint of maximizing emissions according to the standard recommendations; an alternative correlation algorithm could be arranged as follows: • Instead of rotating the EUT and its cables in three orthogonal positions, doing a measurement in the direction of maximum emissions could be sufficient. • This however will require a +/-180º azimuth scan inside the GTEM which could be conducted manually without the need of turntable, in steps of 30º as it is unlikely the EUT along with its cables will have a higher radiation pattern beamwidth than 30º. • In this way, the movement of cables will be kept minimum and their effects will be low across azimuth measurements.

  24. GTEM User Group Meeting - MTL Luton Azimuth Measurements Errors up to 10dB

  25. GTEM User Group Meeting - MTL Luton Azimuth Measurements Errors up to 6dB

  26. GTEM User Group Meeting - MTL Luton Thank You

More Related