Pinal County Air Quality Workshop. Compliance Reporting And Inspections Casa Grande – January 14, 2014 Bob Farrell Environmental Engineer. Compliance Reporting . Reports you need to submit to PCACQD on a periodic basis. Quarterly/Semi-Annual/Annual Appendix “A” Reports.

berg
Download Presentation

Pinal County Air Quality Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pinal County Air Quality Workshop Compliance Reporting And Inspections Casa Grande – January 14, 2014 Bob Farrell Environmental Engineer

  2. Compliance Reporting Reports you need to submit to PCACQD on a periodic basis

  3. Quarterly/Semi-Annual/Annual Appendix “A” Reports • Semi-Annual - Due on/by Jan 30th and July 30th • Annual – Due Jan 30th • Quarterly – 30 Days After each Quarter

  4. Example of Appendix “A” Report

  5. Annual Certifications Due on/by Jan 30th of each year

  6. Emission Inventory • Due 90 days after receipt of EI Package from PCAQCD, usually due late spring of each year.

  7. Example of An Emission Inventory Form For a Large Source

  8. Inspections

  9. What To Expect • Unannounced Visit • Presentation of a PCAQCD entry form. • Record Review (site specific) Examples: Production Reports Inspection of Baghouse Logs Water Logs • Tour of Site • Conduct EPA Method 9 Opacities of Stacks and Vents

  10. PCAQCD Entry Statement

  11. Inspection Checklist

  12. Permit Posted? • Annual regular compliance/compliance report submitted? • Semi-Annual or annual compliance report submitted? • Emissions inventory report submitted? • Meet opacity threshold? • Source performance testing conducted? • Record keeping complete? • Any new or non-permitted equipment? • Emissions control equipment operating efficiently? • Any abnormal operations, shutdowns, or malfunctions? • Any CEM equipment?

  13. Inspection Report Submitted to facility within 30 working days of inspection.

  14. Questions

  15. Who To Call? Bob Farrell, Environmental Engineer (520) 866-6949 Bob.Farrell@pinalcountyaz.gov