60 likes | 222 Views
Technical issues Detail of actions to be developed for the next 6 months. Legionellosis: Risk reduction to public health from environmental sources using biotechnology in the textile sector. Meeting with PO PASCUAL Y BERNABEU, Cocentaina, 29Th November 2010 LIFE07 ENV/E/000794. NEXT STEPS.
E N D
Technical issuesDetail of actions to be developed for the next 6 months. Legionellosis: Risk reduction to public health from environmental sources using biotechnology in the textile sector. Meeting with PO PASCUAL Y BERNABEU, Cocentaina, 29Th November 2010 LIFE07 ENV/E/000794 AITEX, Alcoy, 16Th December 2005
NEXT STEPS ACTION 03 3.1 Study of location possibilities of equipment in the textile company and design the definitive assembly of the prototype (AITEX, SERVYECO, PASCUAL Y BERNABEU) 3.2. Installation of the pilot plat stage en the textile company. 3.3. Putting in operation and control of the plant . (SERVYECO, AITEX) 3.4. Analytic control of the process. (AITEX) 3.5. Introduction of the suitable modifications to increase the efficiency. (SERVYECO, UPV) 3.6. Analysis and study the results. (AITEX, SERVYECO) 3.7. Installation of the prototype in cooling system, which work over circulating water flow, confirming the performance of the design prototype. (AITEX, SERVYECO) 3.8. Translation of the relevant documents. (AITEX, SERVYECO) AITEX, Alcoy, 16Th December 2005 Meeting with PO 29-11-2010
NEXT STEPS ACTION 03 ANALISYS RESULTS OF WATER TO TREAT IN PILOT. During the first trials, pilot plant works with water from well. AITEX, Alcoy, 16Th December 2005 Meeting with PO 29-11-2010
NEXT STEPS ACTION 03 D.3.1- Report of suitable modifications to increase the efficiency and definitive assembly of the prototype. (March 2011) D.3.2- Report of results for the experiences on pilot plant in the textile industry.(September 2011) AITEX, Alcoy, 16Th December 2005 Meeting with PO 29-11-2010
NEXT STEPS ACTION 04 4.1 Detailed study of legal national and international documentation related to prevention and control of legionellosis. (AITEX) 4.2. Legal proposal draft. (AITEX) 4.3. Meetings with the main stakeholders implied in this topic and legal experts . (ALL PARTNERS) D.4.1- Legal proposal draft. (July 2011) D.4.2- Final proposal draft to present in Working day.(October 2011) D.4.3- Final Proposal on Europe wide legal regualtion with inputs and recommendations of Working Day.(December 2011) AITEX, Alcoy, 16Th December 2005 Meeting with PO 29-11-2010
CONTACT PERSON Ms. Corina Mollá / Ms. María Blanes AITEX International Projects Department / AITEX R&D Projects Area Phone : +34 96 554 22 00 Fax : + 34 96 554 34 94 E-mail : kmolla@aitex.es / mblanes@aitex.es FURTHER INFORMATION... AITEX, Alcoy, 16Th December 2005 www.europa.eu.int/comm/environment/life/life/environment.htm