An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-80 Robb Drive to Vista Boulevard Design-Build Project APWA Jeff Lerud, PE, CPM Project Manager

  2. I-80 Robb Drive to Vista Boulevard Design-Build Project

  3. Concept 1 Pavement Reconstruction: Keystone Ave. to 4th St. Keystone Ave. 4th St.

  4. Existing Pavement Conditions

  5. Existing Pavement Conditions

  6. Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements

  7. Intelligent Transportation System ITS Devices • Dynamic Message Signs (DMS) • Travel Time Signs (TTS) • Also • Flow Detectors • CCTV Benefits • Quicker Incident Response Times • Informing the Motorists of Accidents and Travel Times • TRIP RELIABILITY

  8. Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements

  9. Existing Sign Conditions

  10. Concept 4 and 5 Concept 4Restripe I-80 EB to I-580 SB on-ramp Concept 5Widen Virginia St. WB off-ramp to two lanes

  11. Concept 6 E. McCarran Blvd: Widen EB off-ramp

  12. Concept 7 Storm Drain System Improvements at Robb Drive EB on-ramp to I-80

  13. Concept 8 Sparks Blvd: Loop Ramp; Triple Lefts

  14. Concept 9 Auxiliary Lanes: E. McCarran Blvd to Vista Blvd.

  15. Concept 10 Rock Blvd: Widen EB off-ramp

  16. Concept 11 Robb Dr: Widen WB off-ramp

  17. keeprenosparksmoving.com • Traffic alerts • Customize your Commute • Live cameras • Alternate routes • Construction info • Photos

  18. LANDSCAPE & AESTHETICS I-80 ROBB DRIVE TO VISTA BOULEVARD

  19. Rock Blvd. Keystone Ave. Evans Ave. Robb Drive Sparks Blvd. N. Wells Ave. US-395 Kietzke Lane Ralston St. Pyramid Way McCarran Blvd. West Vista Blvd. McCarran Blvd. West Robb Dr.

  20. Rock Blvd. Keystone Ave. Evans Ave. Vista Boulevard Sparks Blvd. N. Wells Ave. US-395 Kietzke Lane Ralston St. Pyramid Way McCarran Blvd. West Vista Blvd. McCarran Blvd. West Robb Dr.

  21. Tank Farm Screening

  22. July 2011

  23. August 2011

  24. September 2011

  25. September 2011

  26. September 2011

  27. September 2011

  28. Project Status • Design will be completed by December, 2011. • The westbound PCCP will be complete this year • The eastbound PCCP work will begin spring, 2012 • Overall project will be completed by December, 2012

  29. Questions? Thank you! Jeff Lerud, Project Manager 775-888-7589 jlerud@dot.state.nv.us