I-80 Robb Drive to Vista Boulevard Design-Build Project

I-80 Robb Drive to Vista Boulevard Design-Build Project. Presentation Goals. Provide project update Review 2011 accomplishments Review 2012 construction Address concerns and answer questions. Project Update. 2011 Accomplishments. 3 miles of new concrete westbound Drainage improvements

claude
Download Presentation

I-80 Robb Drive to Vista Boulevard Design-Build Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-80 Robb Drive to Vista Boulevard Design-Build Project

  2. Presentation Goals • Provide project update • Review 2011 accomplishments • Review 2012 construction • Address concerns and answer questions

  3. Project Update

  4. 2011 Accomplishments • 3 miles of new concrete westbound • Drainage improvements • Widening from McCarran Blvd. to Vista Blvd. • Intelligent Transportation Systems (ITS) • Ramp meters • Sparks Blvd. loop ramp preparation • Early landscape and aesthetic improvements • Web site with live traffic cameras

  5. Westbound New Pavement

  6. Widening E. McCarran to Vista

  7. Truckee Meadows Crossroads • Gateways • Monuments • Sound wall treatments • Tank farm screens • Vegetation

  8. 2012 Timeline

  9. Maintenance of Traffic • Two lanes each direction between Keystone Ave. and Fourth St. • Long term (March to September) ramp closures at: • I-80 eastbound Wells Ave. on and off-ramps • I-80 eastbound Fourth St. off-ramp • I-80 westbound Fourth St. on-ramp • Center St. I-80 eastbound on-ramp (3 weeks) • Extensive outreach and one-on-one meetings with stakeholders and businesses

  10. Upcoming • Complete I-80 eastbound concrete paving from Fourth St. to Keystone Ave. • Complete widening from E. McCarran Blvd. to Vista Blvd. • Construct Sparks loop ramp • Resurfacing E. McCarran Blvd. eastbound off-ramp • Widen Rock Blvd. eastbound off-ramp • Geometric improvements from I-80 eastbound to Southbound US 395 • Resurfacing W. McCarran Blvd. eastbound on-ramp • Widen Robb Dr. westbound off-ramp

  11. I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, NDOT PM, 888-7589 jlerud@dot.state.nv.us Matt Franz, Design-Builder DPM, 352-1908 matt.franz@gcinc.com