1 / 13

FP6 and research infrastructures

This initiative aims to enhance and maintain state-of-the-art radio astronomy facilities, develop new telescopes, improve infrastructure through joint research activities, and promote communication network development. It also includes funding for design studies, contributions to capital costs, and the organization of meetings and workshops. The goal is to create a cohesive and advanced European radio astronomy network.

bogartj
Download Presentation

FP6 and research infrastructures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FP6 and research infrastructures • Main instruments • Integrated infrastructure initiative (I3), several M€/year, 4-5 years • communication network development, 300 M€ for GEANT and grids • design studies, 1-10 M€, 2-4 years • contribution to capital costs of new infrastructures, 10% max, 5-15 M€, lump sum

  2. Vision for European radio astronomy 2001-2010 • Maintain EVN at state-of-the-art • Maintain national facilities at state-of-the-art; training grounds for young astronomers and engineers • Upgrade EVN to e-EVN; links to China, SA, US, Japan essential • Upgrade MERLIN to e-MERLIN for stand-alone and joint with e-EVN observations • Develop and operate new, predominantly regional or national radio telescopes: LOFAR (NL, DE, SE), SRT-64 (IT), Yebes-40 (ES) • Develop and operate new global telescopes: ALMA, SKA

  3. Integrated Infrastructure Initiative: networking activities • management of the network • develop synergies and complementary capabilities • prototype ALMA regional support centre? • incorporate CRAF • meetings and workshops • organisation of radio astronomy in Europe (Foresight Study)

  4. I3: Trans-national access • - continue access program for EVN • - introduce access to individual major radio astronomy facilities operating as stand-alone instruments • (eligibility: annual operating costs > 0.5 M€) • MERLIN, Effelsberg • IRAM, JCMT • Yebes, Nancay • WSRT, SEST

  5. I3: Joint Research Activities • Joint research activities, RTD, to enhance access through improvement of the infrastructure • calibration and imaging software for high sensitivity astronomy • receiver development (components+systems, software, bolometer arrays) for IRAM, Onsala, Metsahovi, Yebes, APEX, ALMA, SRT, EVN • new digital technologies: phased arrays in the focal plane, digital BBCs, new correlator • RFI mitigation

  6. Communication network development • in conjunction with IST thematic priority • includes use of GEANT for specific high performance grids and testbeds • I3 for e-EVN (together with GEANT, BT?, ….) • -Networking activities (EVN) • -Joint Research Project

  7. Design studies • feasibility studies+ technical preparatory work for a new infrastructure (1-10 M€) • need clear European dimension and interest • explore sources of finance for infrastructure eg EIB, Structural Funds • SKA - technical and engineering development towards a 1% demonstrator • - software development for simulations • - cosmology • ALMA – band 1 (0.5 M€)

  8. Contribution to capital costs • for development of new infrastructure which is already funded • EC  max of 10% of total budget for the infrastructure to catalyse construction • for development of technically advanced elements of the future infrastructure, eg instrumentation, connectivity, not buildings, logistics • e-MERLIN

  9. I3: Networking activities management - management will be significantly more autonomous than in FP5 - scientific and financial coordination; generation of reports; cost statements; monitor impact of I3 activities - will need to employ people specifically to manage the contract

  10. I3: Networking activities • develop synergies and complementary capabilities • procedures for applying for observing time; proposal deadlines • level of service to users • coordinated use of major infrastructures e.g. • EVN + MERLIN • national radio telescopes • instrumental and software developments

  11. I3: Networking activities • Meetings and workshops • formal meetings of partners • activity coordination meetings • symposia, schools • outreach • Round Table meetings with other astronomy I3’s

  12. I3: Networking activities • Organisation of radio astronomy in Europe (Foresight Study) • transform I3 into European Council for Radio Astronomy • “centre for European Interferometry at radio wavelengths”? • ALMA, e-MERLIN, e-EVN, LOFAR, SKA

More Related