1 / 4

RMS Presentation by Ernie Podraza, PWG Chair

This presentation by Ernie Podraza, PWG Chair, provides an overview of the annual validation for 2002, DLC implementation, and Project No. 25516 Load Research and Load Profiling. It includes important goal target dates and the iterative discrepancy resolution process. The presentation also discusses the lagged dynamic sample methodology and the involvement of Green Mountain, Comverge, and CenterPoint Energy in residential AC compressor cycling. Additionally, it touches on cost analysis, possible protocol revision requests, and the responsibility of ERCOT and CR in load research and load profiling.

brenton
Download Presentation

RMS Presentation by Ernie Podraza, PWG Chair

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RMS Presentation by Ernie Podraza, PWG Chair • Annual Validation 2002 • DLC Implementation • PUCT Project 25516, Load Research

  2. Annual Validation 2002 • Goal Target Dates • 10/25 ERCOT sends samples to TDSPs. • 11/08 TDSPs and ERCOT share analysis. • *01/01/03 iterative discrepancy resolution. • *01/15/03 ERCOT population analysis. • *01/31/03 TDSPs send 813_20s. • Estimated by Chair • Decision Tree v1.05 (v1.06 soon). • 12 months ending April 2002 from February 2001.

  3. DLC Implementation • PWG consensus of lagged dynamic sample methodology on 10/15/02. • Green Mountain • Residential AC compressor cycling • Comverge is equipment owner • CenterPoint Energy is TDSP • Participant ESI ID list to ERCOT. • ERCOT does load research sample design. • Cost analysis. • Possible Protocol Revision Request for cost recovery.

  4. Project No. 25516 Load Research and Load Profiling • Additional clarity on LR cost recovery. • ERCOT LR samples to support profiles. • DLC LR samples. • Market Participant sponsored. • Customer requested profiles. • CR responsibility. • ERCOT responsibility. • Final comments are due.

More Related