1 / 3

Solar Probe Plus FIELDS Coordinated Burst Signal Peter R. Harvey Oct 25, 2013

Solar Probe Plus FIELDS Coordinated Burst Signal Peter R. Harvey Oct 25, 2013. CBS Calculations. Notes : [1] H(x ) stands for the unit step function, with H(x) = 0 for x<=0 and H(x) = 1 if x >0 . [2] TBLi is the i-th element of the trigger function data table.

brone
Download Presentation

Solar Probe Plus FIELDS Coordinated Burst Signal Peter R. Harvey Oct 25, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Solar Probe Plus FIELDS Coordinated Burst Signal Peter R. Harvey Oct 25, 2013

  2. CBS Calculations Notes: [1] H(x) stands for the unit step function, with H(x) = 0 for x<=0 and H(x) = 1 if x >0. [2] TBLiis the i-th element of the trigger function data table. [3] wjiand THRESHji are 8-bit unsigned bytes that are the weighting factors and thresholds for the i-th element of the data table for the j-th trigger function. [4] Internal arithmetic in each function is performed with 16-bit (unsigned) accuracy, with the 8-bit unsigned MSB of the result becoming the functions output.

  3. CBS Timing

More Related