ISU-ISU STRATEGIS DAN PROGRAM PRIORITAS JAWA TIMUR TAHUN 2015

ISU-ISU STRATEGIS DAN PROGRAM PRIORITAS JAWA TIMUR TAHUN 2015. BADAN PERENCANAAN PEMBANGUNAN daerah. BIDANG PRASARANA WILAYAH. INFRASTRUKTUR JALAN. PROGRESS PANJANG JALAN MENURUT STATUS DAN KONDISI JALAN. PROGRES PENGGUNAN KAWASAN HUTAN UNTUK PEMBANGUNAN JALAN LINTAS SELATAN (JLS).

carlos-ruiz
Download Presentation

ISU-ISU STRATEGIS DAN PROGRAM PRIORITAS JAWA TIMUR TAHUN 2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISU-ISU STRATEGIS DAN PROGRAM PRIORITAS JAWA TIMUR TAHUN 2015 BADAN PERENCANAAN PEMBANGUNAN daerah

  2. BIDANG PRASARANA WILAYAH

  3. INFRASTRUKTUR JALAN

  4. PROGRESS PANJANG JALAN MENURUT STATUS DAN KONDISI JALAN

  5. PROGRES PENGGUNAN KAWASAN HUTAN UNTUK PEMBANGUNAN JALAN LINTAS SELATAN (JLS)

  6. PROGRESS PEMBANGUNAN TOL

  7. INFRASTRUKTUR TRANSPORTASI PERHUBUNGAN

  8. PROGRES PELABUHAN TANJUNG PERAK DI TELUK LAMONG • Pembangunan Terminal Multi Purpose TelukLamongTahap I Nilai : Rp 4.1 T. Untuk pembangunan dermaga (Paket A), konstruksi sudah 99,8%; pekerjaan causeway dan CY (Paket B), konstruksi sudah 2,43%; pembangunan jembatan penghubung (Paket C), konstruksi sudah 25,2%.

  9. PROGRES PENGEMBANGANPELABUHAN • PengembanganPelabuhanBranta Pamekasan. Nilai : Rp 158 M. Dana yang dikucurkan oleh pemerintah sebesar Rp. 30 miliar yang bersumber dari APBN. Target selesai 2014. • PengembanganPelabuhanLamonganNilai : Rp 2.261 M. Dalam proses perizinan. Masih Perlu Klarifikasi.

  10. PENGEMBANGAN BANDARA PERMASALAHAN SISI DARAT : Overloaded, telah dilakukan pengembanganterminal penumpangBandaraJuanda (Enclave), Surabaya Nilai : 1.057 M. Progress fisik mencapai 86%. Sudah GROUND BREAKING • PERMASALAHAN : • KKOP, Kebutuhan Pembangunan Vertikal Perkotaan, Luas Bandara Internasional • Yang Memadai Utk Pengembangan, Investor (KPS + PBMD) • DIBUTUHKAN : • PengembanganBandara Internasional (Sipil/Komersial)Yang Lebih Luas, Sebagai Multiple Airport Di Jawa Timur PERMASALAHAN SISI UDARA : Potensi Sanksi Penerbangan Internasional di Jawa Timur, karena Jarak antara pesawat yang landing dengan yang take off (headway) sudah 1 menit 20 detik atau sudah pada titik optimal kapasitas (idealnya headway 2 menit), MEMBAHAYAKANKESELAMATAN PENERBANGAN SISI UDARA, CITRA & PEREKONOMIAN JAWA TIMUR - NASIONAL. Keselamatan Penerbangan Adalah Hal Yg Tidak Dapat Ditoleransi & Bukan Merupakan Tanggung Jawab Hanya Dari Satu Pihak Saja. Dibutuhkan segera pembangunan Double/Twin runway untuk menambah panjang Runway (landasan pacu) sepanjang 4.000 meter × 60 meter masing-masing runway (Masukan rencana revisi Master Plan Juanda) • Luas Bandara 477,3 Ha • Operator : PT. Angkasa Pura I, PP Nomor 5 Tahun 1992 HAZZARD

  11. PERCEPATAN PELEBARAN ALUR PELAYARAN BARAT SURABAYA (APBS TOL FEE) TAHAP II BUOY 5 Pendalaman dan pelebaran Alur APBS harus didorong percepatannya agar Pipa Gas Bawah Air dapat segera dipindah oleh Pertamina Hulu Energy West Madura Offshore. BUOY 6

  12. RENCANA PENGEMBANGAN BUS RAPID TRANSIT (BRT) AGLOMERASI DI KAWASAN GKS SURVEY WAKTU DAN JARAK TEMPUH TERM. PORONG-TERM. TOW Rute : Terminal Porong – Terminal TambakOsoWilangun SURVEY WAKTU DAN JARAK TEMPUH TERM. PORONG - TERM. TOW Trayek Lainnya : Trayek Surabaya - Sidoarjo - Porong (via tol) Trayek Sidoarjo - Jembatan Merah Surabaya Trayek Sidoarjo - Bandara Juanda Trayek Sidoarjo – Bangkalan Trayek Surabaya - Bunder – Paciran Trayek Tambak Osowilangun – Tanjung Perak Trayek Tambak Osowilangun - Kenjeran

  13. INFRASTRUKTUR KECIPTAKARYAAN (AIR MINUM)

  14. INFRASTRUKTUR KECIPTAKARYAAN (PERUMAHAN)

  15. RENOVASI RUMAH TAK LAYAK HUNI (RTLH) Nama : Samuti Alamat : Sukolilo Barat, Kec. Labang Umur : 70 tahun Pekerjaan : Buruh Tani Titik Kordinat : LS: Derajat : 07, Menit : 09, Detik : 553 Bujur Timur : Derajat : 112, Menit : 46, Detik: 621 Program RTLH dilaksanakan secara bertahap berdasarkan MoU antara Pemprov Jatim dengan Kodam V/Brawijaya Tahun 2009 s/d 2012 biaya sebesar Rp. 5 juta/unit, Tahun 2013 sebesar Rp. 6 juta/unit

  16. INFRASTRUKTUR SUMBER DAYA AIR

  17. Pengendalian Banjir Bengawan Solo Hilir • melalui Sudetan Plangwot – Sedayu Lawas Ujung Pangkah Sedayu Lawas • KONDISI SAAT INI : • Debit Bengawan Solo = 3.500 m3/det • Debit Sudetan = 640 m3/det • Debit Banjir ke Ujung Pangkah = 2.860m3/det • Menimbulkan genangan di hulu dan hilir Plangwot Plangwot • RENCANA : • Debit Rencana di Sudetan = ± 2.500 m3/det • Debit Rencana ke Ujung Pangkah = ± 1.000 m3/dt • Mempercepat aliran banjir menuju ke laut sehingga tinggi muka air banjir, lama genangan dan Luas genangan di Bojonegoro dan Tuban dapat dikurangi • Wilayah Lamongan dan Gresik dari Plangwot sampai dengan Ujung Pangkah terbebas dari luapan Bengawan Solo Sedayu Lawas Ujung Pangkah Plangwot

  18. Ilustrasi Pengalihan Sebagian Besar Debit Banjir Bengawan Solo melalui Sudetan Plangwot – Sedayu Lawas Inlet dan Sudetan Plangwot ditingkatkan sampai 2500 m3/dt Rencana Bangunan Regulator baru di Sungai Utama kapasitas 1000 m3/dt Plangwot 2500 m3/dt Bengawan Solo 1000 m3/dt

  19. WADUK LAPANGAN DENGAN LAPISAN GEOMEMBRANE • Merupakan solusi jangka pendek antisipasi bencana kekeringan • Pada TA 2012 telah dibangun 11 unit tersebar di 6 Kabupaten, 41 unit telah dibangun pada 2013 di 8 Kabupaten). • Dibangun di lokasi rawan kekeringan, jauh dari sumber air dan kondisi tanah lolos air • Kapasitas antara 2.000 – 5.000 m3 yang mampu memenuhi kebutuhan air untuk 3 – 4 bulan selama musim kemarau Waduk Geomembran Desa Kedungdowo Kec. Sugihwaras (Bojonegoro)

  20. PEMBANGUNAN TAMPUNGAN AIR BARU Waduk Nipah (Sampang) Waduk Gonggang (Magetan) Waduk Bajulmati (Banyuwangi) Bojonegoro Barrage Normalisasi Wd.Leran (Bojonegoro) Sembayat Barrage (Lamongan)

  21. BIDANG REGIONAL