60 likes | 73 Views
Store Summary. Studies/Work Completed. Implemented remote control of PBJ system Study to reduce dispersion at D0 Implemented new optics to reduce Dispersion at D0 Smoothed orbits between stores. Biddled and repaired C47 power leads(Q6) Replaced F47 turbo station
E N D
Store Summary Tevatron Coordinator - FNAL
Studies/Work Completed • Implemented remote control of PBJ system • Study to reduce dispersion at D0 • Implemented new optics to reduce Dispersion at D0 • Smoothed orbits between stores. • Biddled and repaired C47 power leads(Q6) • Replaced F47 turbo station • Installed new code in BPM system to put traps to try and catch the problem with houses going into abort mode Tevatron Coordinator - FNAL
The Last 10 Stores Tevatron Coordinator - FNAL
F13 cryo vacuum problem leads to access Tevatron Coordinator - FNAL
Studies for the Week • Studies for the week Tevatron Coordinator - FNAL