Store Summary Tevatron Coordinator - FNAL
Numbers for the week Tevatron Coordinator - FNAL
Lum for the week Tevatron Coordinator - FNAL
Integrated for the Week Tevatron Coordinator - FNAL
Studies/Work Completed • BOS to work on system to increase pbar transverse emittance. (currently blowing up Emit at injection). • After Quench on Store 5843 parsed squeeze and redefined orbit, tunes and coupling. These are big changes. Tevatron Coordinator - FNAL
Problems • Replaced regulator for T:VC43 after tripping during shot setup. • D17V separator spark (little loss of lum) • RF station trip during store. (little loss of lum) Tevatron Coordinator - FNAL
Pbar Brightness Squeeze Quench Store 5843 Tevatron Coordinator - FNAL
D0 Losses in Squeeze after Parse LMC4SM LMB1SD Tevatron Coordinator - FNAL
Rough Results of Pbar Emit growth Used PBJ to increase Pbar emittance Store 5852 Store 5850 Tevatron Coordinator - FNAL