Serguei SadovskyPHOS DCS meeting10 of March 2004 PHOS DCS status Serguei Sadovsky
ALICE DCS planning and PHOS PHOS DCS status PHOS DCS team PHOS DCS plans & milestones Conclusion Outlook Serguei Sadovsky
Prototypes of sub-detector DCS …………….. mid. 04 DCS tests with sub-detector equipment …….…mid. 05 Installation of detector DCS infrastructure ……mid. 05 Installation of detector DCS……………………mid. 06 Commissioning of detector DCS ………………mid. 07 As for PHOS DCS, during the coming year we have to make tests with the PHOS sub-detector equipment and to performed installation of the PHOS DCS infrastructure ALICE DCS planning and PHOS Serguei Sadovsky
Prototype of the PHOS module cooling Prototype of the APD HV regulation Prototype of the LED monitoring system Choice of the LV & HV power supplies PHOS FEE (ALTRO and KI) design, prototyping RCU design PHOS DCS User Requirement Document, the first version PHOS DCS status, 1(what has been really done ?) Serguei Sadovsky
TPC DCS experience HMPID DCS experience ALICE DCS team help ?????? PHOS DCS status, 2(what can be used ?) Serguei Sadovsky
PHOS cooling ……………………....Yu.Vinogradov ? PHOS LV & HV power supplies……H.Muller ? APD HV regulation …………………A.Vinogradov ? PHOS FEE………………………..…Yu.Sibiryak ? RCU………………………………… B.Skaali ? PHOS cabling (DCS infrastructure) …????????? PHOS DCS programming ….. Sarov, Protvino, Oslo ?? CPV DCS, gas ………………………S.Sadovsky PHOS DCS coordination ……………S.Sadovsky ? PHOS DCS team(proposal to start discussion) Serguei Sadovsky
We have to write the final PHOS DCS URD.………...… mid. 04 We have to fix PHOS cabling for DCS infrastructure ..…mid. 04 We have to test the PHOS DCS with the sub-detector equipment……………………………………………….. mid. 05 We need therefore to organize the PHOS DCS Lab with the chosen LV & HV PS, the FEE cards, local DCS infrastructure and DCS computer …………... mid. 05 We have to perform the Lab tests of the PHOS DCS model ……………………………………………………mid. 05 PHOS DCS plans & milestones Serguei Sadovsky
To meet the ALICE DCS time scheduler we have to organize ourselves to make investments in the PHOS DCS, both in the equipment and manpower to start real job for the DCS tests in a Lab and/or during the PHOS prototype beam test Conclusion Serguei Sadovsky