1 / 6

XIS Flight Calibration Plan

XIS Flight Calibration Plan. Hironori Matsumoto (Kyoto Univ.). Items for the first one year: OBF check (Vega) Q.E. (Crab) Gain/CTE (Cas A, E0102) Timing (Crab, E0102). Target List for Feb. 2005. Total: 64ks. Priority 1: Essential Priority 2: Not essential, but preferred

chaman
Download Presentation

XIS Flight Calibration Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XIS Flight Calibration Plan Hironori Matsumoto (Kyoto Univ.) • Items for the first one year: • OBF check (Vega) • Q.E. (Crab) • Gain/CTE (Cas A, E0102) • Timing (Crab, E0102)

  2. Target List for Feb. 2005 Total: 64ks Priority 1: Essential Priority 2: Not essential, but preferred Priority 3: Can be omitted

  3. Target List for Aug. 2005 (and Feb. 2006) Total 466.4ks (x 2)

  4. Crab Crab 2ks QE and Timing Effectively 47 c/s (burst 0.2s mode) 1.QE(E)xEA(E) = Count(E)/Crab_Model(E) 2. Fit the QE(E) with an CCD model consists of a gate and a depletion layer. Accuracy: depletion layer … +/- 5% gate … +/- 6%

  5. E0102-72 Monitor the gain and efficiency at the low energy band. O VIII Kα (0.65keV) 7700 cts for 20ks Accuracy of the center energy … +/- 10eV

  6. Cas A Monitor the gain and efficiency at the high energy band. Fe XXV Kα (6.70keV) 1400 cts for 1.2ks Accuracy of the center energy … +/- 10eV

More Related