60 likes | 161 Views
XIS Flight Calibration Plan. Hironori Matsumoto (Kyoto Univ.). Items for the first one year: OBF check (Vega) Q.E. (Crab) Gain/CTE (Cas A, E0102) Timing (Crab, E0102). Target List for Feb. 2005. Total: 64ks. Priority 1: Essential Priority 2: Not essential, but preferred
E N D
XIS Flight Calibration Plan Hironori Matsumoto (Kyoto Univ.) • Items for the first one year: • OBF check (Vega) • Q.E. (Crab) • Gain/CTE (Cas A, E0102) • Timing (Crab, E0102)
Target List for Feb. 2005 Total: 64ks Priority 1: Essential Priority 2: Not essential, but preferred Priority 3: Can be omitted
Target List for Aug. 2005 (and Feb. 2006) Total 466.4ks (x 2)
Crab Crab 2ks QE and Timing Effectively 47 c/s (burst 0.2s mode) 1.QE(E)xEA(E) = Count(E)/Crab_Model(E) 2. Fit the QE(E) with an CCD model consists of a gate and a depletion layer. Accuracy: depletion layer … +/- 5% gate … +/- 6%
E0102-72 Monitor the gain and efficiency at the low energy band. O VIII Kα (0.65keV) 7700 cts for 20ks Accuracy of the center energy … +/- 10eV
Cas A Monitor the gain and efficiency at the high energy band. Fe XXV Kα (6.70keV) 1400 cts for 1.2ks Accuracy of the center energy … +/- 10eV