Verification results of COSMO at MeteoSwiss in the year 2008 and experiences with CVS

Verification results of COSMO at MeteoSwiss in the year 2008 and experiences with CVS. COSMO General Meeting 2008 WG5 Parallel Session 15 September 2008. Experiences with CVS Pirmin Kaufmann MeteoSwiss. Installation hints.

Download Presentation

Verification results of COSMO at MeteoSwiss in the year 2008 and experiences with CVS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Verification results of COSMOat MeteoSwiss in the year 2008and experiences with CVS COSMO General Meeting 2008 WG5 Parallel Session 15 September 2008

  2. Experiences with CVSPirmin KaufmannMeteoSwiss

  3. Installation hints • Installation does not work without trailing slash in INSTALLATION_PATH • For 64 bit EMOS, insert –Dbit64 after pgf90 in all make scripts: make_*_linux.sh • Newer EMOS libraries need JSEC2=4096 instead of JSEC2=64 in *vs_bufr_decode.F • Large BUFR files need DO ILOOP =1,500000 instead of DO ILOOP =1,50000 in gvs_bufr_decode.F • Example files and documentation are sometimes inconsistent, e.g. • -UTC missing in example file fcs_date.par • UWIND ,VWIND instead of WMOD, WDIR and vice versa

  4. Running CVS • BUFR files for GVS must not contain any reports with another date, e.g. no 00 UTC reports from following day • BUFR files for HVS must contain 23 UTC sounding from previous day • GRIB files for GVS must not contain any other fields with the same GRIB element number, e.g. no T, U, V on other levels • GRIB files for HVS must contain T, U, V on all required pressure levels

  5. Fixed Bugs • Height correction for temperature was applied with wrong sign • Grid points with land fraction < 1.0 (later 0.55) are considered water points and excluded from the association of the grid points to stations. Correct value now 0.5. • Irrelevant for practical application: The conversion of K to deg C was done with the subtraction of 273.16 (triple point) instead of 273.15 (freezing point).

  6. Remaining Bugs • HVS calculates only out to +66 h lead time, all scores for the +72 h lead time are written as 0.00 • Grid point selection is neither old nor new standard as decided last GM in 2007

  7. Desirable Features • GVS extraction of obs data should control date of BUFR message, same for GRIB extraction • HVS extraction of obs data should look for soundings with 23 UTC reference time in file of previous day • Test consistency of extracted and verified lead times • Currently bogus +54 h to +66 h scores are calculated without warning even when fcs data have only been extracted out to +48 h • Test consistency of land mask and orography with model GRIB files • Remove write(555,*) commands in gvs_grib_decode.F

  8. Verification results of COSMOat MeteoSwiss in the year 2008Francis Schubiger, Pirmin Kaufmann,Christophe Hug, Vanessa StauchMeteoSwiss COSMO General Meeting 2008 WG5 Parallel Session 15 September 2008

  9. COSMO: Verification packages for COSMO-7 and COSMO-2 • Operational: • Surface (3h-steps SYNOP and 1h-steps SMN [Swiss Met Net]) • psred, ps, T2m, Td2m, 10m-wind, cloud cover, precipitation and since Spring 2008 also wind gusts • Upper-air(TEMP) • T, F, RH, wind • Ongoing in experimental modus: • Windprofiler Payerne and Schaffhausen • Precipitation with RADAR (fuzzy verification, Ebert’s package) • Fluxes at Payerne • New / Next developments: • Global radiation at SYNOP stations • VAD (locations of swiss radars) • Phased out: • integrated water vapor content with GPS data • weather-type dependant verification with RADAR and TEMP => All these packages should be integrated in VERSUS 2

  10. Surface pressure bias (mean error) Spring 08 Winter 07/08 in winter 07/08 hig positive bias in Spring 08 high negative bias but observed pressure in Spring 08 is 9.6 hPa lower than Winter 07/08 see results of U. Damrath: low ps (obs) -> negative bias high ps (obs) -> positive bais

  11. 2m temperature diagnostics - Impact study: COSMO-7 forecast of 08.05.08 Zermatt 1600m Gd St Bernard 2400m Evolene Valais 1800m

  12. 2m temperature diagnosticsimpact on mean diurnal cycle Summer 2007 Summer 2008 The (well known) errors of: - too strong temperature increase in the morning- maxima reached ~ 1.5-2 h too earlyis removed with the new 2m temperature diagnostics (introduced operationally 09.06.08)

  13. 2m temperature over Switzerlandbias Summer 2008 (CVS-Software) 300-800m > 800m

  14. 2m dewpoint (mean error) Spring 08 Summer 08 Spring 08: bimodal pattern, negative (dry) bias along coasts, positive (wet) bias at inland stations Summer 08: the dry bias discontinues the strongly increased wet bias of the summers 2006 and 2007

  15. Other results in 2008:Precipitation, windspeed, cloudiness • precipitation: • extreme high positive bias at the borders of the model (N and E) since Autumn 2006, disappeared in Spring 2008 • since Winter 07/08 less precipitation, especially the strong amounts are now underestimated (due to new microphysics and Runge-Kutta: introduced opr in November 2007 and in testchain from 14.7.-31.08.07) Summer 2007 2008 change opr testchain opr 07 > 08 mean obs 1.45 1.29 1.28 -12%mean mod 1.69 1.04 0.95 -44% fbi(1mm/12h) 1.16 1.00 0.93fbi(5mm/12h) 1.02 0.73 0.66fbi(10mm/12h) 1.00 0.64 0.55fbi(50mm/12h) 2.16 0.63 0.52 • Windspeed: negative bias along the coast and on mountains, positive bias inland • Cloudiness: partial coverage underestimated

  16. Precipitation over Switerland Spring 2008Frequency bias (12h-sums) of CVS-software

  17. Precipitation over Switerland Summer 2008Frequency bias (12h-sums) of CVS-software

  18. Comparison COSMO-2 and COSMO-710m windspeed: standard deviation of errors Spring 2008 over the COSMO-2 domain STD (m/s) COSMO-7 COSMO-2 about 400 stations Forecast lenght

  19. Comparison COSMO-2 and COSMO-710m windspeed Winter 07/08 COSMO-2 • stronger over-estimation especially in narrow valleys • over Swiss Middleland lower overestimation (or even low under- estimation) • Lower understimation over mountain stations • Standard deviation of errors lower (better) COSMO-7

  20. COSMO-7 COSMO-2 Comparison COSMO-2 and COSMO-7Verification Payerne soundings:windspeed (standard deviation of errors) December 07 / January 08 12h - forecasts Druck (hPa) STD (m/s)

  21. windgust: oldvs new for 16.01.-17.03.08

  22. windgust: old vsnew for 16.01.-17.03.08

  23. windgust: old vs new for 16.01.-17.03.08over Switzerland new old

  24. Windgust: number of obs Summer 2008

  25. Windprofiler vs. COSMO-2 Wind speed (ff) on 2008-08-19 Windprofiler Schaffhausen assimilated

  26. Verification global radiation: Kloten

  27. Global radiation at Kloten 12 UTCCOSMO DMO vs error in 2006

  28. Verification global radiation: Kloten

  29. Example of wrong observations12h-sums of precipitation Autumn 2007 occurence of precipitation of 0.1 mm/12h> 80%(up to 100%) at 5 locations (!)