Non-Res Lighting Subcommittee. Retrofit Lighting Standard Protocol Review 10/23/13. What has happened since March?. Incorporated comments from March subcommittee meeting into protocol Further revised protocol and interview guide to use consistent language
E N D
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 10/23/13
What has happened since March? • Incorporated comments from March subcommittee meeting into protocol • Further revised protocol and interview guide to use consistent language • Split protocols into “retrofit” and “LPA required” instead of “pre-conditions” and ”current practice” • In reality, retrofits could have both baselines present • Waiting to develop provisional data collection section until remainder of protocol is reviewed
Key Definitions Space Use Type (SUT) • For retrofits, SUT is used to define a space inside/outside the building with a specific use and occupancy hours of use (HOUocc) • SUT is linked to LPA requirements for installations governed by code System • Combination of fixtures associated with a single control type within each SUT • Takes into account individual controls effects on different fixtures • (Ex. daylight sensors vs. manual switch in same space) • Many fixtures within a SUT can be considered a single system if they have the same control types (i.e. multiple occ sensors in open office) • Lighting calculator would require line item entry of fixtures and controls, (i.e. a system) with a SUT and HOUocc for each system Project • Sum of all SUT’s and their systems is considered the project • HVAC IF based on primary equipment used to condition entire project
SUT SUT SUT SUT SYSTEM* SUT SYSTEM SYSTEM SYSTEM SUT PROJECT *If HOUocc are the same for all fixtures/controls. Systems cannot cross a SUT.
Example Space Data Collection • Baseline data collection • Identify a SUT based on HOUocc and use of the space • Identify each system within a SUT • A system is associated with a particular control type • These systems all occur within the same SUT therefore HOUoccshould be the same • Note: Systems cannot cross SUT • Eventually determine controlled HOU for each system • Apply CSF and results of site interview Gathered by interview
Example Space Data Collection • Determine baseline power of each system • CSF is used to apply an adjustment to HOUocc for each system • Interview answers used to roll up to annual savings Calculator does this based on inputs
Example Space Data Collection • Efficient Case Data Collection & Consumption • Utilize same SUT boundaries when applicable • Note: Major change in SUTs means retrofit protocol N/A • Same method as baseline for fixture count, quantity, etc. for each control type within a system • Calculator can determine savings allocation • Controls savings vs. wattage reduction savings
Where things will get tricky • Some controls affect both wattage and HOU • Ex. Combo daylight/occ sensor • Would need to define consumption and HOU at each power level • Can we do so accurately with an interview guide? • HOU required for each space (SUT) • Some programs do this for whole building only • Plan to use interview guide to test whole building occupancy schedule to individual SUT schedules for possible simplification in the future
Interview Guide • Need to link answers from interview guide to savings calculation components • i.e. if practitioner asks a question, the answer needs to be used for something • Limit interview guide to only questions that are needed to inform HOU-related estimates • Includes space HOU and controls-related HOU • Ex. combo daylight/occ sensor HOU reduction
Interview Guide • Need to determine if the guide asks the correct questions to get answers needed for savings estimation • Can we remove some? Or refine them to get at a more reliable answer? • Understand that programs might use their own interview guide to streamline process in field. • i.e. Developing an electronic guide would allow for flexibility with many SUTs
Provisional Data Needs – Next step • Need to collect provisional data to prove the Simplest Reliable Method is reliable compared to a best practice approach • We don’t appear to have reliable data on: • HOU estimates • Controls Savings Fractions • Fixture wattages? • Recent data suggests manufacturer rating may not be reliable • Large number of possibilities given various control types and SUTs • 150+ possibilities just using current list of options
Comparison of Methods Need to collect provisionally * Prior best practice was to use manufacturer’s default lamp/fixture rating