HFT-Beam Pipe

HFT-Beam Pipe. D. Beavis BNL March 14, 2012. Overview. Update on new Beam pipe Assembly drawing Material changes Length changes Outlook. Assembly. East end changes. Spool piece 30 inches 316 SS Taper shorter and flanges are Al-TI bimetal. West changes.

chogan
Download Presentation

HFT-Beam Pipe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HFT-Beam Pipe D. Beavis BNL March 14, 2012

  2. Overview • Update on new Beam pipe • Assembly drawing • Material changes • Length changes • Outlook HFT F2F at LBNL March 14, 2012

  3. Assembly HFT F2F at LBNL March 14, 2012

  4. East end changes Spool piece 30 inches 316 SS Taper shorter and flanges are Al-TI bimetal HFT F2F at LBNL March 14, 2012

  5. West changes Tapered section shorter and has Al-Ti flanges Section from 280cm to 403 cm may be desirable to be SS or Ti for cost purposes HFT F2F at LBNL March 14, 2012

  6. Outlook • Awaiting for cost/schedule for NEG coating and heating jacket • Determining how to fabricate the Al2219 pipe • May try other alloys • May machine from solid piece • All fabrication awaiting the determination of the Al2219 pipe • Still appears that pipe can be complete in time for the next run. Will update as get schedule details • Update (3/14/12) • We heard from CERN and they can have the Be pipe NEG coated and wrapped by the end of June. • The Italian company will respond by tomorrow. They need to look up one more price on things. • Also CERN said they could provide the heating material to us so that BNL can wrap the pipes. HFT F2F at LBNL March 14, 2012