An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Live Replacement of 400kv Busbar Insulators in Brasov Substation Live Replacement of 400kv Busbar Insulators in Brasov Substation Dr. Ing. Stelian Alexandru Gal- CN Transelectrica SA- Romania Ing. Marius Nicolae Oltean- SC Smart SA- Romania Ing. Ioan Sevastre- SC Smart SA- Romania Ing. Lucian Brabete- SC Smart SA- Romania CITTES 2011

  2. Live Replacement of 400kv Busbar Insulators in Brasov Substation The replacement of 400kV insulator strings was the first investement project realized in LW technology in a substation in Romania. The work was performed in bare hand method, using an aluminum lather. It was the proper technology for replacement of porcelain insulators with composite insulators. The work was performed by a crew from Smart Company- Sibiu Branch, and it lasted for four months. General wiew Sept, 2011, Salta CITTES 2011

  3. Starting inputs: Brasov Substation Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  4. For the 400kV busbar, the connection to the devices is made of ACSR twin conductors, as follows: - Busbars- system 1 and 2, 2x970/228 mm2 ACSR - Transfer couple - 2x450/75 mm2 ACSR - Transversal couple and the connections to the devices 2x450/75 mm2 ACSR Live Replacement of 400kv Busbar Insulators in Brasov Substation The substation is placed in: - Meteorological zone: II, - pollution zone: II; - From the wind action point of view: zone B; - From the snow action point of view:zone B; CITTES 2011

  5. Caracteristicile lanţurilor de izolatoare There are 6 types of insulator strings: - simple suspension string 400kV, 12 pieces - double suspension string 400kV, mounted in ”V”, 3 pieces - double suspension string 400 kV, mounted in „V”, equipped with yoke- 99 pieces. - double suspension string 400 kV, mounted in „V”, without yoke- 81 pieces. - double suspension string 400 kV, mounted in ”parallel”, with yoke- 9 pieces. - double suspension string 400 kV, mounted in „parallel”, without yoke- 15 pieces. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  6. Busbar insulation in 400kV Brasov substation Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  7. LW method justification By analyzing power readigs on each breezeway (night gap, morning peak, day gap, evening peak) for two calendar days (working day- Wendesday, resting day- Sunday) of each month (January-August 2005) on each 400kV bay, from Brasov substation, we had the following observations: Live Replacement of 400kv Busbar Insulators in Brasov Substation - The transmission of active power usually works from the 400kV OHL Sibiu and Bradu to the 400kV OHL Gutinas and Darste - The transmission of reactive power usually works from the 400kV OHL Gutinas to Brasov to the other 400kV OHL Sibiu, Bradu and Dârste - One 250MVA 400/110kV transformer provides the power demand for 110kV consumers in Brasov substation, so any transformer (150MW) can be deenergised - The simultaneous deenergising of more 400kV OHL may influence the system’s stability and should be approved by the National Dispatch Center (NDC). CITTES 2011

  8. Conclusions on the deenergising of the equipment The replacement of suspension strings in Brasov substation may be done with deenergised equipment for the following works: - For the busbar system 2 – 15 Double Parallel Strings and 54 Double V string may be replaced - The consecutive deenergizing of T1 and T2 transformers (51 Double V Strings in total). Other works which will imply the deenergising of equipments are not possible to perform; the National Dispatch does not allow simultaneous withdrawal from service of more equipments The remaining works should only be done in LW technology (68% of the work volume). Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  9. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  10. Executed Works • - only the insulated strings were replaced, (the tension clamps and the yokes remained irretrievable); • The insulator strings were formed with composite insulators Hi Lite EPG 400-160-4203-22, 95-NN20 type (manufactured by Eximprod Group Buzau under Chance license); • for the string make-up, we reused the existing fittings (yokes, ball eyes OSDr-20) and the compression tension clamps, • - the new mounted strings were built-up so that the length of a new string with spreader and a new string without spreader to be the same with the length of an existing string, with or without spreader. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  11. Before Live Replacement of 400kv Busbar Insulators in Brasov Substation After CITTES 2011

  12. LW technology The works were complied with Transelectrica’s Operational Procedure TEL 07.12/2003 „Performing Live Working in Transelectrica’s High Voltage Equipments”and the technical procedures belonging to S.C. Smart S.A. Live Replacement of 400kv Busbar Insulators in Brasov Substation The basic working team consisted of: - A LW foreman with the authorization type I 3T. - Eight (8) LW workers with the authorization type I 1T. The work was executed by the bare hand method CITTES 2011

  13. It is necessary that the equipment is in Special Exploitation Regime (SER): • verifying that the Differential Busbar Protection is in operation; • ensuring radio or telephone connections between the working area and the dispatch center; • manually connecting to energize the equipment, can be done only with the agreement of the foreman; • - it is forbidden to operate the switchgears in the substation, as this may affect the status of the busbar. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  14. Minimum Approach Distances Live Replacement of 400kv Busbar Insulators in Brasov Substation Weather Conditions It is forbidden to start the work in the following weather conditions: - Showers(rain, snow, drizzle, hail,) or relative humidity higher than 80%, - Thick fog, - Strong wind (over 9.5 m/s), - Lightning (storm) in the working area. CITTES 2011

  15. Risk Analysis and Prevention Measures • The foreman owns: • the Working Authorization (ALST) • the Technical Instruction (SMART-IT-LST 66) • the Specific Safety Instruction (SMART-ISSM-66). Live Replacement of 400kv Busbar Insulators in Brasov Substation • The foreman • ensures that the equipment identifying conditions and the access conditions in the working area are respected. • indicates the way and the route for the workers to climb on the portal and the way to manipulate the access tools • is supervising the working area throughout the whole procedure. CITTES 2011

  16. Work Preparation The foreman identifies the equipment on which the crew will work and compares the working area with the one mentioned in the LW authorization. The foreman identifies the weather conditions in the working zone. The tools and the devices are prepared on rack and on the canvas. The insulating sections of the tools are cleaned and greased with silicone oil.The 3 workers which will work at height will dress with electro conductive suits, anti-UV goggles, electro conductive boots and climbing systems. The working tools and the safety devices are checked. The foreman also checks the workers’ physical and psychical condition. The foreman is distributing the specific tasks for each worker and is reminding them of the work method and the risks which may occur. He is checking that things are well understood by the crew. The workers are signing the papers. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  17. Working Method Two workers are climbing on the crossarm. They will carry up and mount the strain carriers on the crossarm. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  18. The access ladder is mounted on the conductors. • The mobile part of the ladder is descended on the ground. • The worker climbs from the ground to the conductors, on the ladder. He is fastening the mobile part of the ladder to the firm one. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  19. The workers are mounting the strain carrier assembly. They are relieving strain from the insulating string, dismantling the string. The insulating string is descended to the ground. The new insulation strig is raised and mounted. The strain is relieved on strain carrier. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  20. Conclusions It was for the firs time that a designer has thoroughly analyzed the comparative costs for an investement project. When starting a project it is mandatory to take into account the costs involved by the working teams and by manipulation of devices, as well as the costs of congestions, own technological consumption and maneuvers. One shouldn’t forget the advantages of network reliability, the increase of work safety, less operating conditions demands for the transmission network and the dispatch demands on the redundancy. This was the first LW technology project performed in a Romanian substation. Live Replacement of 400kv Busbar Insulators in Brasov Substation CITTES 2011

  21. Live Replacement of 400kv Busbar Insulators in Brasov Substation THANK YOU FOR YOUR KINDLY ATTENTION ! CITTES 2011