ALICE gas systems meeting

ALICE gas systems meeting. Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014 . Outline. PH-DT-DI Gas Service Team. Gas Service Team mandate:

clove
Download Presentation

ALICE gas systems meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014 Outline R. Guida, A. Wasem PH-DT-DI Gas

  2. PH-DT-DI Gas Service Team • Gas Service Team mandate: • M&O and upgrades of the gas systems for all the LHC experiments: • preventive and corrective maintenance on 30 gas systems • on-call service all along the year (24/24 7/7) – phone 162516 • Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …) • General support for test beam and equipment belonging to external users. ALICE Albin Wasem Introduction – Working team FSU team Jonathan Dumollard AbdelmajidLaassiri Benjamin P. Marichy HerveMartinati Ace Ordanov (User) Cedric Landraud (also CMS-CO2) Guillaume Lacroix (also CERN Expo) ALICE Frederic Merlet (0.25) Louis-P. De Menezes (0.5) Coordination R. Guida CMS-TOTEM Andrea D’Auria (0.5) LHCb Patrick Carrie (0.5) Steven Pavis (0.25) R. Guida, A. Wasem PH-DT-DI Gas

  3. PH-DT-DI Gas Service Team First contact persons for all issues related to ALICE gas systems during working hours is in charge of: -standard operation -standard maintenance/small modifications -daily check of all systems ALICE A. Wasem 16-0943 ALICE experiment and Gas Service Team If Albin is on holiday or busy: -during working hours  call directly Roberto (16-2146) -outside working hours  call directly on-call service (16-2516) Outside working hours call directly on-call service (16-2516) R. Guida, A. Wasem PH-DT-DI Gas

  4. Gas Service working team • In order to cope with LS1 a significant reinforcement of the team during 2013 was needed: • two new users with high experience in the workshop (mechanics and gas systems) • many students for short and well defined projects • Details: • CERN FTE (and students > 1 year): • 6.3 FTE: +1.3 wrt 2012 • Ernesto: TTS 50% for gas project • “FSU” (FSU + technical users): • 5.5 FTE: +1.5 wrt 2012 • Ace: user on ALICE budget • Andrei: user on ALICE budget • Trainees (student < 1 year) • 1.9 FTE: +1.8 wrt 2012 • 4 trainees (3 from Poland, 1 from Canada) • 2 summer students • 2 children of staff members Working team R. Guida, A. Wasem PH-DT-DI Gas

  5. PH-DT-DI Gas Service Team • 2013 activities can be divided into three main sectors: • Standard maintenance of gas systems for the LHC experiments • LS1 consolidation program for the LHC experiments • Not LHC experiments/support to users • Standard maintenance andLS1 consolidation programconstitute the main field of activity • Not LHC experiments and support to users represent about 20% of the activities LS1 – 2013: Overview R. Guida, A. Wasem PH-DT-DI Gas

  6. Review usage of ALICE gas M&O 2013 • ALICE contribution to M&O budget for gas systems: • 130+ 28 (2013-LS1 consolidation) kCHF • Total 158 kCHF On-call service: ALICE gas M&O 2013: on-call • Analysis (TRD) • Gas supply high flow alarm (Ar, CO2, N2) • Power supply (24 V) • Pressure regulation valve (TPC) • Pump (TPC) • Purifier (TRD) • Xerecuperation (TRD) • Gas supply not ready (EN-MEF) Xe, R134a, SF6, Ar • Infrastructure (GS-ASE) GS intervention, Ar-H2 • Software (EN-ICE) Communication, TPC R. Guida, A. Wasem PH-DT-DI Gas

  7. Review usage of ALICE gas M&O 2013 On-call service summary On average only 1.5 h/year/system of downtime (power-cuts and outside events excluded) Intervention triggered by: ALICE gas M&O 2013: on-call • Intervention are: • Equally distributed between experiments • Decreasing with time  R. Guida, A. Wasem PH-DT-DI Gas

  8. Review usage of ALICE gas M&O 2013 ALICE gas M&O 2013: material R. Guida, A. Wasem PH-DT-DI Gas

  9. Review usage of ALICE gas M&O 2013 ALICE gas M&O 2013: material R. Guida, A. Wasem PH-DT-DI Gas

  10. Review usage of ALICE gas M&O 2013 ALICE gas M&O 2013: material for gas workshop R. Guida, A. Wasem PH-DT-DI Gas

  11. Review usage of ALICE gas M&O 2013 FSU and users (i.e. Andrey, Ace) ALICE gas M&O 2013: FSU resources R. Guida, A. Wasem PH-DT-DI Gas

  12. Review usage of ALICE gas M&O 2013 Summary: ALICE gas M&O 2013: summary about 58 kCHFoverspending R. Guida, A. Wasem PH-DT-DI Gas

  13. 2013 schedule LS1 – 2013 schedule R. Guida, A. Wasem PH-DT-DI Gas

  14. 2014 schedule More details available on the excel table in agenda LS1 – 2014 schedule R. Guida, A. Wasem PH-DT-DI Gas

  15. Software upgrade Main responsible: Steven Pavis • EN-ICE ispreparing the migration to a new software version (CPC6 & more). • The migration requires to (~) completely rewrite the code (PLC+PVSS): • Preparation phase needed to definestrategy and milestons • Define modules, test logic, … • Validation of one/twogassystemscoveringalmost all functionalities • Deployment on one experiment (all detectors) • Deployment on all the experiments • A completecommissioningwillberequired (same as itwasdoneat the first start-up of the gassystems) • About one-twoweek of stop/instability for each detector • ActivitiyscheduledfromJanuary to April 2014 • Resolveremaining bugs without long stop of gassystems - September-October 2014 Software upgrade R. Guida, A. Wasem PH-DT-DI Gas

  16. Software upgrade Software upgrade Main responsible: Steven Pavis R. Guida, A. Wasem PH-DT-DI Gas