An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forward Planning

  2. 3 components: i) Forward planning Plans (County Development Plan and 12 Local Area Plans) • Strategies (Housing/Retail/Wind) • Studies (Housing Land Availability) • Input into other plans (Local Economic and Community Plan) • ii) Heritage • Built, natural & archaeological heritage (Heritage Plan) • iii) Conservation • Record of Protected Structures

  3. Wider Context • • National Planning Framework replacing National Spatial Strategy… • • Regional Spatial and Economic Strategies of the three Regional Assemblies to run from 2016-2022.... • Office of Planning Regulator - evaluate and assess plans, report to Minister, undertake research.... • Planning Policy Statement – community shape process, coordinate local authorities and other bodies, provide guidance.... • • Infrastructure planning by Irish Water, National Transport Authority, energy grid operators.... • • New economic realities require a more focused approach.. • • Wider policy context: climate change adaptation, transitioning to a low carbon economy, economic development, environmental protection..

  4. Kildare County Development Plan 2017 - 2023 • Council document – transcends all functions and areas • Evidence based, open, transparent and inclusive • Sets out an overall strategy for proper planning and sustainable development of county • Includes 20 village plans, 21 rural settlement strategies and 5 environs plans. Establishes the policy framework for: • Planning application decisions • Developments by Council - houses, roads etc (Part 8) • Delivery and co-ordination of infrastructure

  5. How a County Development Plan is put together 7 key stages – 6 year life We are here ! Subject to Strategic Environmental Assessment /Appropriate Assessment /Strategic Flood Risk Assessment

  6. Timeline • 99 week review process • Commenced2 April 2015 • Completed 23 February 2017 • Operational 23 March 2017 • Public key input into the following stages: • Issues Paper • draft Development Plan • Amendments to draft Development Plan • Draft Development Plan is adopted by elected members

  7. Issues Paper 8 week consultation period – 2 April to 29 May Newspaper Notice Publication of Issues Paper Poster On line or hard copy submissions Information Sessions – each MD

  8. Issues Paper Topics Strategic Direction/Vision; Population and Housing; Economic Development, Enterprise and Employment; Movement and Transportation; Infrastructure Environment; Social, Community and Cultural Development; Urban Design and Architecture; Landscape and Heritage; Rural Development and Natural Resources; and Tourism

  9. Local Area Plans • Typically for towns with a population 5000+ • Lasts for 6 years • Review can be deferred • Must be consistent with the objectives of the county development plan, its core strategy, and regional planning guidance • Contents • zoning objectives; • objectives for phased development, community facilities, amenities and on standards for design of development

  10. Local Area Plans • 7 key stages Subject to SEA/AA/SFRA

  11. Review of Local Area Plan • 18 to 35 weeks to complete from date draft Local Area plan is placed on public display • Members key input into the following stages: • Adoption of draft Development Plan • CEO’s Report on Submissions made on the draft Development Plan • Adoption of the Development Plan

  12. 12 Local Area Plans Celbridge/Castletown 2010 Clane 2009 Kilcock 2009 Sallins 2009 Monasterevin 2008 Kilcullen 2014 Leixlip/Collinstown 2010 Naas 2011 Newbridge 2013 Maynooth 2013 Kildare & Magee Barracks 2012 Athy Town & environs 2012

  13. Local Area Plans currently under review Draft on display • Kilcock • Monasterevin Issues Paper • Leixlip / Collinstown • Celbridge / Castletown Background research • Sallins • Clane