Manajemen Produksi dan Operasi

Manajemen Produksi dan Operasi. Material Requirement Planning ( MRP ) M-7. Suatu Furniture Company membuat kursi-kursi berdasarkan bagan bahan di bawah ini . Pada saat ini tingkat persediaan di tangan dan Lead Time pemesanan tiap bagian termuat seperti tabel di bawah .

corin
Download Presentation

Manajemen Produksi dan Operasi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manajemen Produksi dan Operasi Material Requirement Planning ( MRP ) M-7

  2. SuatuFurniture Company membuatkursi-kursiberdasarkanbagan bahandibawahini .Padasaatinitingkatpersediaanditangandan Lead Time pemesanantiapbagiantermuatsepertitabeldibawah . Perusahaan akanmemproduksi 700 kursipadaminggu ke-6 dan 500 padaminggu ke-7. a).Buatperencanaanbahanutk.semuabagian b) Tindakanapayg. harus dilakukansekarang . Kursi Rakitan Belakang Alas Kaki Rakitan Kaki Penyangga Palang kaki Kaki Bagian Atas (4) (4) (4)

  3. Kursi , Lead Time = 1 Rakitan Kaki , Lead Time = 2

  4. Palang Kaki , Lead Time = 1 Kaki , Lead Time = 1

  5. Rakitan Belakang , Lead Time = 1 Bagian Atas, Lead Time = 2

  6. SOAL KUIS • PT. IIP adalahprodusenaccumerek XGS, perusahaaninibarusajamenerima order dari PT. ASTRA sebanyak 1200 accu type N100 untuk Daihatsu Taft GT. • Accu XGS N100 iniakandiselesaikandandikirmke ASTRA padamingguke 6. • TiapAccuterdiridari: • Rakitandalam terdiridari: 6 selpositif, 6 selnegatif, 2 pole, 6 separator. • Rakitanluar terdiridari: 1 bakaccu, 1 cover bakaccu, 6 tutup, 1 indikator • 1 Packaging

  7. Tabelberikutmemberikan data terkaitdenganaccu XGS N100 Buatstrukturproduknya Buatrencanakebutuhan material menggunakan MRP. Gunakanmetode lot sizing denganteknik lot for lot, EOQ dan POQ, bandingkan.

  8. end