110 likes | 289 Views
AASHTO Technical Committee on Cost Estimating. 2007 Update. TCCE – 2007 Update. Member Update Chapter Update Information Available 2008 Workplan. Member Update. Chair: Vacant Vice Chair: David Kent, NY Secretary: Jim Sinnette, FHWA. AASHTO Liaison Keith Platte FHWA Jim Sinnette
E N D
AASHTO Technical Committee on Cost Estimating 2007 Update
TCCE – 2007 Update • Member Update • Chapter Update • Information Available • 2008 Workplan
Chair: VacantVice Chair: David Kent, NYSecretary: Jim Sinnette, FHWA • AASHTO Liaison Keith Platte • FHWA Jim Sinnette Frank Csiga, NV – Past Chair and Jeff Hisem, OH – Past Vice Chair
Region 1 • Maryland Norie A. Calvert • New Jersey Joseph Weber • Vermont Michael J. Fowler • New York Dave Kent Region 2 • Florida Philip "Greg" Davis • Georgia Darrell Richardson • Kentucky Ryan Griffith • South Carolina James Frick
Region 3 • Iowa Roger E. Bierbaum • Ohio Jeff Hisem • Missouri Travis D. Koestner • Minnesota Timothy Quinn Region 4 • Montana Lesly Tribelhorn • Oregon John Riedl • Texas Maria Burke • Washington John N. (Jay) Drye, Jr.
Cost Based Estimating Travis Koestner Missouri Bid Based Estimating Jim Frick, South Carolina Bid Analysis John Riedl, Oregon Parametric Estimating Mike Fowler, Vermont Risk/Probabilistic Jay Drye, Washington Inflation Forecasting John Riedl, Oregon Definitions/Format Ryan Griffith, Kentucky Chapter Update
Information Available • A Practical Guide to Estimating • Draft of first 3 chapters • On the web • Google – AASHTO TCCE • TEA Website Link • Your AASHTO reps., Chief Engr, Bridge Engr, Construction Rep, and Design Rep will be notified.
2008 Work Plan • Finalize Definitions– Dec. 1, 2007 • Finalize first 3 chapters– Dec. 1, 2007 • Complete next 3 chapters – June 2008 • 20-7 Research Applications – June 2008 • Explore next chapter needs – Oct. 2008