1 / 11

Production of West Balkan EEA CSIs

Production of West Balkan EEA CSIs. WGEMA meeting, Geneva, 12-13 June 2007. What are the outcomes ?. Produced 12 common EEA CSIs for West Balkan countries Compendium with produced EECCA indicators. Why fact sheet and compendium?. Short-term Communicating the results to general public

dallon
Download Presentation

Production of West Balkan EEA CSIs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production of West Balkan EEA CSIs WGEMA meeting, Geneva, 12-13 June 2007

  2. What are the outcomes? • Produced 12 common EEA CSIs for West Balkan countries • Compendium with produced EECCA indicators

  3. Why fact sheet and compendium? Short-term • Communicating the results to general public • Testing reliability of data Long-term • Strengthening regional cooperation • Follow-up actions

  4. What will be included? 12 regional EEA CSIs fact sheets: • CSI 006 Production and consumption of ozone depleting substancesCSI 008 Designated areas • CSI 012 Global and European temperature • CSI 031 Renewable electricity • CSI 034 Fishing fleet capacity • CSI 032 Status of marine fish stocks

  5. CSI 014 Land take • CSI 016 Municipal waste generation • CSI 022 Bathing water quality • CSI 021 Nutrients in transitional, coastal and marine waters • CSI 019 Oxygen consuming substances in rivers • CSI 020 Nutrients in freshwater

  6. What are the selection criteria? • Realistic selection (reliable data and time series without gaps) • Further improvement under the present activity

  7. What are the main challenges? • Data (data reliability) • Used methodology

  8. How do we overcome them? • Comparison with international data sources • Country clarifications • Statistical gap filling • Excluding indicators based on poor data/methodology

  9. What is the process of commenting by countries? • Continuous consultations throughout the production process • New data and information collection

  10. Fact sheets for comments • CSI 006 Production and consumption of ozone depleting substances • CSI 031 Renewable electricity

  11. Contact person Jasmina Bogdanovic UNEP/GRID Arendal Project manager E-mail: jasmina@grida.no Mob: +43 650 424 5809